Worked example
Example: 640 acres, 30 ft oil zone. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Reservoir fluid | Oil |
| Drainage area | 259.00 ha |
| Net pay thickness | 9.1440 m |
| Porosity | 20.000 % |
| Initial water saturation | 25.000 % |
| Initial formation volume factor (B_oi, or B_gi in reservoir m³ per standard m³) | 1.3000 - |
| Recovery factor | 30.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Hydrocarbon pore volume | 3,552,428 m³ |
| Volume in place at surface (stock-tank oil or standard gas) | 2,732,637 m³ |
| Recoverable volume | 819,791 m³ |
Open this example in the calculator and change any input.
Formula
\(V_p = Ah\phi(1 - S_{wi}), \quad N = \frac{V_p}{B_i}, \quad N_r = N\cdot RF\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\text{fluid}\) | Reservoir fluid | - |
| \(A\) | Drainage area | m² |
| \(h\) | Net pay thickness | m |
| \(\phi\) | Porosity | - |
| \(S_{wi}\) | Initial water saturation | - |
| \(B_i\) | Initial formation volume factor (B_oi, or B_gi in reservoir m³ per standard m³) | - |
| \(RF\) | Recovery factor | - |
| \(V_p\) | Hydrocarbon pore volume | m³ |
| \(N\) | Volume in place at surface (stock-tank oil or standard gas) | m³ |
| \(N_r\) | Recoverable volume | m³ |
Method and standards
Volumetric balance.
Where it is used
- Early reserve estimates.
- Checking material-balance results.
Common mistakes
- Using gross instead of net pay.
- Mixing reservoir and surface units for B_g.
Assumptions and limits
- Uniform average properties.
References
- Ahmed
- Reservoir Engineering Handbook
- 5th ed. (Gulf Professional Publishing, 2019)
- ch. 4 and ch. 13 (volumetric method)
Questions and answers
Why divide by the formation volume factor?
It converts the reservoir volume of oil or gas to surface (stock-tank or standard) volume.
What recovery factor is typical?
About 5–30 % for oil on primary depletion, more with waterflood; 50–90 % for gas.
What do the defaults represent?
A 640-acre, 30 ft oil zone with 20 % porosity, 25 % water and B_oi = 1.3.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.