FireCADCalc

Gas Reservoir Material Balance (p/z)

Original gas in place of a volumetric gas reservoir from initial and current p/z and the gas produced, and the recovery factor reached.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 3,000 to 2,500 psia after 10 BcfLate life

Results

Volumetric (no water influx) reservoir: p/z falls on a straight line against G_p and reaches zero at G. Water drive keeps p/z higher and makes this G too large; plot several points to check the line.

Initial p/z3,529.4psi
Current p/z2,976.2psi
Original gas in place (standard)1.8065e+09m³
Recovery to date15.675%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 3,000 to 2,500 psia after 10 Bcf. The inputs, in the units selected above:

InputValue
Initial reservoir pressure3,000.0 psi
Z at initial pressure0.85000 -
Current reservoir pressure2,500.0 psi
Z at current pressure0.84000 -
Cumulative gas produced (standard)2.8317e+08 m³

Applying the formula below gives:

ResultValue
Initial p/z3,529.4 psi
Current p/z2,976.2 psi
Original gas in place (standard)1.8065e+09 m³
Recovery to date15.675 %

Open this example in the calculator and change any input.

Formula

\(\frac{p}{z} = \frac{p_i}{z_i}\left(1 - \frac{G_p}{G}\right) \;\Rightarrow\; G = G_p\frac{p_i/z_i}{p_i/z_i - p/z}\)

Variables

Symbol Meaning SI unit
\(p_i\) Initial reservoir pressure Pa
\(z_i\) Z at initial pressure -
\(p\) Current reservoir pressure Pa
\(z\) Z at current pressure -
\(G_p\) Cumulative gas produced (standard) m³
\(p_i/z_i\) Initial p/z Pa
\(p/z\) Current p/z Pa
\(G\) Original gas in place (standard) m³
\(G_p/G\) Recovery to date -

Method and standards

Volumetric gas material balance.

Where it is used

  • Reserves booking and depletion planning.
  • Checking volumetric estimates.

Common mistakes

  • Using surface pressures instead of reservoir pressures.
  • Ignoring water drive.

Assumptions and limits

  • Volumetric reservoir; no influx.

References

  • Ahmed
  • Reservoir Engineering Handbook
  • 5th ed. (Gulf Professional Publishing, 2019)
  • ch. 13 (gas reservoirs, volumetric material balance)

Questions and answers

Why plot p/z?

For a volumetric gas reservoir, p/z falls linearly with cumulative production, so two or more points fix the gas in place.

What if the points curve upward?

Water influx or a connected aquifer is supporting pressure; a simple p/z line then overstates the gas in place.

What do the defaults represent?

A reservoir that fell from 3,000 to 2,500 psia after producing 10 Bcf.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.