Worked example
Example: Illustrative OPC, 350 kg/m3. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Tricalcium silicate | 58.000 % |
| Dicalcium silicate | 16.000 % |
| Tricalcium aluminate | 8.0000 % |
| Tetracalcium aluminoferrite | 10.000 % |
| Cement content of the concrete | 3.5000e+08 mg/Nm³ |
| Volumetric heat capacity of the concrete | 2,400,000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Heat of complete hydration | 444.02 kJ/kg |
| Adiabatic temperature rise of the concrete at complete hydration | 64.753 K |
Open this example in the calculator and change any input.
Formula
\(H = 502\,C_3S + 260\,C_2S + 867\,C_3A + 419\,C_4AF\ \text{(J/g)}, \quad \Delta T_{ad} = \frac{H\,c}{\rho c_p}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(C_3S\) | Tricalcium silicate | - |
| \(C_2S\) | Dicalcium silicate | - |
| \(C_3A\) | Tricalcium aluminate | - |
| \(C_4AF\) | Tetracalcium aluminoferrite | - |
| \(c\) | Cement content of the concrete | kg/m³ |
| \(\rho c_p\) | Volumetric heat capacity of the concrete | - |
| \(H\) | Heat of complete hydration | J/kg |
| \(\Delta T_{ad}\) | Adiabatic temperature rise of the concrete at complete hydration | K |
Method and standards
Heat of hydration.
Where it is used
- Mass concrete and thermal cracking checks.
- Comparing cement types.
Common mistakes
- Treating the complete-hydration heat as the early heat.
- Ignoring supplementary materials in blended cement.
Assumptions and limits
- Complete hydration; adiabatic concrete.
References
- Heats of complete hydration of the clinker compounds
Questions and answers
How much heat does Portland cement release?
About 450–500 kJ/kg at complete hydration; about 70 % of it in the first week.
How hot can a mass pour get?
About 18 K per 100 kg/m³ of Portland cement at complete hydration with no heat loss; real pours rise less because hydration is incomplete in the first days and some heat escapes.
What do the defaults represent?
An illustrative OPC with 58 % C₃S, 16 % C₂S, 8 % C₃A and 10 % C₄AF in concrete with 350 kg/m³.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Taylor, Cement Chemistry, 2nd ed. (Thomas Telford, 1997)