Worked example
Example: Illustrative 4.8 x 74 m, 3000 t/d. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Shell diameter | 4.8000 m |
| Refractory thickness | 220.00 mm |
| Kiln length | 74.000 m |
| Clinker production | 3,000.0 t/d |
| Heat input at the kiln burner | 40.000 MW |
Applying the formula below gives:
| Result | Value |
|---|---|
| Effective inside diameter | 4.3600 m |
| Inside cross-section | 14.930 m² |
| Burning-zone thermal loading | 2.6792 MW/m² |
| Volumetric loading | 2.7154 |
| Specific loading per cross-section | 200.94 |
Open this example in the calculator and change any input.
Formula
\(D_i = D_s - 2t_r, \quad q_A = \frac{\dot Q_k}{\pi D_i^2/4}, \quad \frac{\dot m_{cl}}{V} = \frac{\dot m_{cl}}{A_iL}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(D_s\) | Shell diameter | m |
| \(t_r\) | Refractory thickness | m |
| \(L\) | Kiln length | m |
| \(\dot m_{cl}\) | Clinker production | kg/s |
| \(\dot Q_k\) | Heat input at the kiln burner | W |
| \(D_i\) | Effective inside diameter | m |
| \(A_i\) | Inside cross-section | m² |
| \(q_A\) | Burning-zone thermal loading | W/m² |
| \(\dot m_{cl}/V\) | Volumetric loading | - |
| \(\dot m_{cl}/A_i\) | Specific loading per cross-section | - |
Method and standards
Kiln loading.
Where it is used
- Kiln capacity upgrades.
- Comparing kilns and burner settings.
Common mistakes
- Using shell diameter instead of inside diameter.
- Counting calciner fuel in the kiln thermal loading.
Assumptions and limits
- Uniform refractory thickness; outputs in t/d.
References
- Rotary kiln loading measures
Questions and answers
Why does burning-zone thermal loading matter?
It governs refractory and coating life; pushing output by firing harder raises it.
Why are calciner kilns smaller?
Most calcination happens in the calciner, so the kiln only completes burning and can carry far more clinker per m³.
What do the defaults represent?
An illustrative 4.8 m × 74 m kiln with 220 mm refractory, 3,000 t/d clinker and 40 MW at the kiln burner.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Duda, Cement Data Book, Vol. 1, 3rd ed. (Bauverlag, 1985), Peray, The Rotary Cement Kiln, 2nd ed. (Chemical Publishing, 1986)