Worked example
Example: 15 kg/m2 s, 60 m2, 3 cyclones. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Solids circulation flux in the furnace | 15.000 kg/(m²·s) |
| Furnace cross-section | 60.000 m² |
| Number of cyclones (loop seals) | 3.0000 - |
| Voidage of solids in the standpipe | 50.000 % |
| Particle density | 2,500.0 kg/m³ |
| Solids velocity in the standpipe | 0.15000 m/s |
| Horizontal solids velocity through the opening | 0.10000 m/s |
Applying the formula below gives:
| Result | Value |
|---|---|
| Solids flow per loop seal | 1,080.0 t/h |
| Standpipe diameter | 1,427.3 mm |
| Loop seal length (2.5 d_s) | 3,568.2 mm |
| Loop seal breadth (1.25 d_s) | 1,784.1 mm |
| Height of the opening | 1,345.2 mm |
Open this example in the calculator and change any input.
Formula
\(W_s = \frac{G_sA_f}{n_c}, \quad d_s = \sqrt{\frac{4W_s}{\pi(1 - \varepsilon_s)\rho_pV_s}}, \quad L = 2.5\,d_s, \quad B = 1.25\,d_s, \quad h_o = \frac{W_s}{(1 - \varepsilon_s)\rho_pV_hB}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(G_s\) | Solids circulation flux in the furnace | kg/(m²·s) |
| \(A_f\) | Furnace cross-section | m² |
| \(n_c\) | Number of cyclones (loop seals) | - |
| \(\varepsilon_s\) | Voidage of solids in the standpipe | - |
| \(\rho_p\) | Particle density | kg/m³ |
| \(V_s\) | Solids velocity in the standpipe | m/s |
| \(V_h\) | Horizontal solids velocity through the opening | m/s |
| \(W_s\) | Solids flow per loop seal | kg/s |
| \(d_s\) | Standpipe diameter | m |
| \(L\) | Loop seal length (2.5 d_s) | m |
| \(B\) | Loop seal breadth (1.25 d_s) | m |
| \(h_o\) | Height of the opening | m |
Method and standards
Basu's loop seal sizing: the solids flow per loop seal sets the standpipe diameter at the chosen solids velocity (Eqs. 8.12–8.13), the seal length and breadth follow Basu's proportions, and the opening height gives the chosen horizontal solids velocity (Eq. 8.14). The number of cyclones is rounded to a whole number.
Where it is used
- CFB loop design.
Common mistakes
- Using total circulation instead of per loop seal.
- Too high a standpipe velocity.
Assumptions and limits
- Guideline proportions, not mandatory.
- Warnings appear for a standpipe solids velocity above 1 m/s and a horizontal velocity outside 0.05–0.25 m/s. The opening height is not checked against the seal dimensions: check it fits below the weir.
References
- Basu
- Circulating Fluidized Bed Boilers: Design
- Operation and Maintenance (Springer, 2015)
- ch. 8
- Eqs. (8.12)–(8.14) and guidelines L = 2.5 d_s
- B = 1.25 d_s
Questions and answers
What solids velocity should I use?
Basu suggests about 0.15 m/s and never above 1 m/s.
Why an opening between chambers?
Solids pass under a weir from the supply to the recycle chamber; its height sets a horizontal solids velocity of 0.05–0.25 m/s.
Is this the only method?
Basu also allows taking the cyclone's bottom outlet as the standpipe if the solids velocity stays below 1 m/s.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.