Worked example
Example: AFBC 20 m², 400 mm bed, coal 10 t/h, 0.2 t/h sand. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Bed plan area | 20.000 m² |
| Static (settled) bed height | 400.00 mm |
| Bulk density of the settled bed | 1,500.0 kg/m³ |
| Fuel firing rate | 10.000 t/h |
| Ash in fuel, as fired | 30.000 % |
| Share of the ash that leaves as bed drain | 30.000 % |
| Sand make-up rate | 0.20000 t/h |
| Share of make-up sand lost as fines with the fly ash | 20.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Bed inventory | 12.000 t |
| Bed drain rate to hold the level | 1.0600 t/h |
| Mean residence time of bed material | 11.321 h |
| Sand make-up per day | 4.8000 t |
| Sand carried out with the fly ash | 40.000 kg/h |
Open this example in the calculator and change any input.
Formula
\(W_b = A_b H_s \rho_b\)
\(\dot m_d = \dot m_f A f_b + \dot m_{mu} (1 - e)\)
\(\tau = W_b / \dot m_d\)
\(W_{mu} = \dot m_{mu} \times 86\,400\ \text{s}, \quad \dot m_{fs} = e\,\dot m_{mu}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A_b\) | bed plan area | m² |
| \(H_s\) | static (settled) bed height | m |
| \(\rho_b\) | bulk density of the settled bed | kg/m³ |
| \(\dot m_f\) | fuel firing rate | kg/s |
| \(A\) | ash in fuel, as fired | - |
| \(f_b\) | share of the ash drained from the bed | - |
| \(\dot m_{mu}\) | sand make-up rate | kg/s |
| \(e\) | share of make-up lost as fines | - |
| \(W_b\) | bed inventory | kg |
| \(\dot m_d\) | bed drain rate | kg/s |
| \(\tau\) | mean residence time | s |
| \(W_{mu}\) | sand make-up per day | kg |
| \(\dot m_{fs}\) | sand carried out with the fly ash | kg/s |
Method and standards
A steady mass balance on the bed: to hold the level, solids are drained at the rate they arrive and stay. The inventory is the settled bed volume times its bulk density; the mean residence time is inventory over drain rate.
Where it is used
- Setting the bed drain and make-up schedule.
- Estimating sand consumption and cost.
- Checking bed ash handling capacity.
Common mistakes
- Using the expanded (fluidised) height instead of the settled height for the inventory.
- Forgetting limestone residue when limestone is fed.
- Assuming all ash stays in the bed: most leaves as fly ash.
Assumptions and limits
- Steady bed level and size distribution.
- Limestone and its residue not included; unburnt carbon in the drain not included.
- Bulk density of the settled bed, not of the particles.
References
- Mass balance on the bed
Questions and answers
How long does bed material stay in the bed?
Inventory divided by the drain rate. A 20 m² bed with 400 mm of settled bed holds 12 t; draining about 1.06 t/h it turns over in about 11 hours.
Why is sand make-up needed?
Fine sand is carried out with the fly ash and some is drained with the bottom ash, so fresh sand keeps the bed size and level right, especially with low-ash fuels.
What drains from the bed?
Everything that arrives and stays: the bottom-ash share of the fuel ash, the make-up sand not carried away as fines, and limestone residue if limestone is fed.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.