FBC Bed Inventory, Bed Drain and Sand Make-Up

Bed inventory of a fluidised bed boiler, the bed drain rate that holds the bed level, the residence time of bed material and the daily sand make-up.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paperFood, dairy and textileBoiler

Inputs

Examples: AFBC 20 m², 400 mm bed, coal 10 t/h, 0.2 t/h sandRice husk AFBC 12 m², 350 mm, 6 t/h, 0.15 t/h sandCFBC 40 m², 600 mm, 25 t/h, 0.5 t/h sand

The rest leaves as fly ash; from ash weighings or the boiler maker.

Results

Steady bed level: the solids that stay in the bed are drained at the rate they arrive. Limestone residue, if limestone is fed, and unburnt carbon add to the drain; they are not included.

Bed inventory38.400t
Bed drain rate to hold the level3.8750t/h
Mean residence time of bed material9.9097h
Sand make-up per day12.000t
Sand carried out with the fly ash125.00kg/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: AFBC 20 m², 400 mm bed, coal 10 t/h, 0.2 t/h sand. The inputs, in the units selected above:

InputValue
Bed plan area20.000 m²
Static (settled) bed height400.00 mm
Bulk density of the settled bed1,500.0 kg/m³
Fuel firing rate10.000 t/h
Ash in fuel, as fired30.000 %
Share of the ash that leaves as bed drain30.000 %
Sand make-up rate0.20000 t/h
Share of make-up sand lost as fines with the fly ash20.000 %

Applying the formula below gives:

ResultValue
Bed inventory12.000 t
Bed drain rate to hold the level1.0600 t/h
Mean residence time of bed material11.321 h
Sand make-up per day4.8000 t
Sand carried out with the fly ash40.000 kg/h

Open this example in the calculator and change any input.

Formula

\(W_b = A_b H_s \rho_b\)

\(\dot m_d = \dot m_f A f_b + \dot m_{mu} (1 - e)\)

\(\tau = W_b / \dot m_d\)

\(W_{mu} = \dot m_{mu} \times 86\,400\ \text{s}, \quad \dot m_{fs} = e\,\dot m_{mu}\)

Variables

Symbol Meaning SI unit
\(A_b\) bed plan area m²
\(H_s\) static (settled) bed height m
\(\rho_b\) bulk density of the settled bed kg/m³
\(\dot m_f\) fuel firing rate kg/s
\(A\) ash in fuel, as fired -
\(f_b\) share of the ash drained from the bed -
\(\dot m_{mu}\) sand make-up rate kg/s
\(e\) share of make-up lost as fines -
\(W_b\) bed inventory kg
\(\dot m_d\) bed drain rate kg/s
\(\tau\) mean residence time s
\(W_{mu}\) sand make-up per day kg
\(\dot m_{fs}\) sand carried out with the fly ash kg/s

Method and standards

A steady mass balance on the bed: to hold the level, solids are drained at the rate they arrive and stay. The inventory is the settled bed volume times its bulk density; the mean residence time is inventory over drain rate.

Where it is used

  • Setting the bed drain and make-up schedule.
  • Estimating sand consumption and cost.
  • Checking bed ash handling capacity.

Common mistakes

  • Using the expanded (fluidised) height instead of the settled height for the inventory.
  • Forgetting limestone residue when limestone is fed.
  • Assuming all ash stays in the bed: most leaves as fly ash.

Assumptions and limits

  • Steady bed level and size distribution.
  • Limestone and its residue not included; unburnt carbon in the drain not included.
  • Bulk density of the settled bed, not of the particles.

References

  • Mass balance on the bed

Questions and answers

How long does bed material stay in the bed?

Inventory divided by the drain rate. A 20 m² bed with 400 mm of settled bed holds 12 t; draining about 1.06 t/h it turns over in about 11 hours.

Why is sand make-up needed?

Fine sand is carried out with the fly ash and some is drained with the bottom ash, so fresh sand keeps the bed size and level right, especially with low-ash fuels.

What drains from the bed?

Everything that arrives and stays: the bottom-ash share of the fuel ash, the make-up sand not carried away as fines, and limestone residue if limestone is fed.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.