Worked example
Example: 25 000 t press mud. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Press mud for the season | 25,000 t |
| Spent wash per tonne of press mud | 2.5000 m³/t |
| Spent wash to dispose of in the season | 90,000 m³ |
| Yard area per tonne of press mud (m² per t) | 0.60000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Spent wash absorbed | 62,500 m³ |
| Spent wash left for other treatment | 27,500 m³ |
| Composting yard area | 15,000 m² |
Open this example in the calculator and change any input.
Formula
\(V_a = \min(V_{sw}, M_{pm} r), \quad A = \frac{M_{pm}}{1000\ \mathrm{kg/t}}\, a\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(M_{pm}\) | Press mud for the season | kg |
| \(r\) | Spent wash per tonne of press mud | m³/kg |
| \(V_{sw}\) | Spent wash to dispose of in the season | m³ |
| \(a\) | Yard area per tonne of press mud | m² per t (entered as a number) |
| \(V_a\) | Spent wash absorbed | m³ |
| \(V_x\) | Spent wash left for other treatment | m³ |
| \(A\) | Composting yard area | m² |
Method and standards
Mass balance.
Where it is used
- Distillery effluent planning.
- Consent applications.
Common mistakes
- Ratio per tonne of compost instead of press mud.
Assumptions and limits
- Season totals.
References
- Mass balance; ratio and area from consent conditions (CPCB guidance values as user inputs)
Questions and answers
What ratio?
Consents have commonly allowed a few cubic metres of spent wash per tonne of press mud; follow yours.
Why does the season matter?
Composting stops in rain; storage must hold spent wash meanwhile.
Is composting ZLD?
It is one route; concentration and incineration is another.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.