FireCADCalc

Payback, NPV and IRR of an Energy-Saving Project

Simple payback, net present value and internal rate of return of a heat-recovery or energy-saving project from its cost, annual saving, discount rate and life.

BoilerEconomiser and air preheater

Inputs

Examples: Economiser 6 million, saves 2.4 million a year, 10 %, 15 yearsCondensate return 1.5 million, saves 0.9 million, 12 %, 10 yearsAir heater retrofit 20 million, 3 million, 9 %, 20 years

Results

Simple payback (years)2.6087
Net present value (your currency)1.1494e+07
Internal rate of return38.029%
Net annual saving2,300,000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Economiser 6 million, saves 2.4 million a year, 10 %, 15 years. The inputs, in the units selected above:

InputValue
Investment (your currency)6,000,000 -
Annual saving (your currency per year)2,400,000 -
Annual operation and maintenance cost100,000 -
Discount rate10.000 %
Life of the project (years)15.000 -

Applying the formula below gives:

ResultValue
Simple payback (years)2.6087
Net present value (your currency)1.1494e+07
Internal rate of return38.029 %
Net annual saving2,300,000

Open this example in the calculator and change any input.

Formula

\(PB = \frac{I}{S - M} \qquad NPV = -I + \sum_{k=1}^{n}\frac{S - M}{(1 + r)^k} \qquad 0 = -I + \sum_{k=1}^{n}\frac{S - M}{(1 + IRR)^k}\)

Variables

Symbol Meaning SI unit
\(I\) investment, your currency –
\(S\) annual saving –
\(M\) annual operation and maintenance cost –
\(r\) discount rate –
\(n\) life of the project, years –
\(PB\) simple payback, years –
\(NPV\) net present value –
\(IRR\) internal rate of return –
\(S - M\) net annual saving –
\(k\) year number –

Method and standards

Discounted cash flow with equal net savings at the end of each year; the IRR is the discount rate at which the NPV is zero, found by bracketed root finding.

Where it is used

  • Justifying economisers, air heaters, condensate recovery, insulation, VFDs and O₂ trim.
  • Energy audit reports and capital requests.
  • Comparing two options with different costs and savings.

Common mistakes

  • Using the gross saving and forgetting the running cost of the new equipment.
  • Mixing a nominal discount rate with savings in today's money.
  • Counting a saving at full load when the boiler runs mostly at part load.

Assumptions and limits

  • Equal savings every year; no salvage value, tax or inflation.
  • Investment at the start of year one; whole years of life.
  • Discount rate from 0 up to (not including) 100 %. An IRR outside −99 % to 1 000 % is not shown.

References

  • Discounted cash flow (end-of-year convention)
  • standard engineering economics

Questions and answers

How do I calculate payback, NPV and IRR?

Payback is the investment over the net annual saving. An economiser costing 6 million that saves 2.4 million a year with 0.1 million upkeep pays back in 2.6 years; over 15 years at 10 % its NPV is 11.5 million and its IRR 38 %.

Which should I use to decide?

Payback is easy and shows risk, but ignores what happens after it. NPV says how much value the project adds at your cost of money; IRR lets projects of different sizes be compared. Most companies set a payback limit and an IRR hurdle.

Are tax and inflation included?

No. Enter savings and costs in today's money and use a real discount rate, or add tax effects separately.

Method and article reviewed by FireCAD engineering on 10 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.