FireCADCalc

Electrostatic Precipitator Efficiency (Deutsch–Anderson)

Efficiency of an electrostatic precipitator from migration velocity, plate area and gas flow (Deutsch–Anderson), and the area for a target.

Thermal power plantSugar mill and cogenerationRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 15 000 m2 at 150 m3/sSmall ESP

From the ESP maker or a test on your dust; typically 0.02–0.2 m/s.

Results

SCA in m² per m³/s. The effective migration velocity bundles dust resistivity, size and rapping losses.

Specific collecting area A/Q66.667m²/(m³/s)
Collection efficiency99.517%
Area for the target1,726.9m²

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 15 000 m2 at 150 m3/s. The inputs, in the units selected above:

InputValue
Effective migration velocity0.060000 m/s
Collecting plate area15,000 m²
Gas flow (actual)540,000 m³/h
Target efficiency99.800 %

Applying the formula below gives:

ResultValue
Specific collecting area A/Q100.00 m²/(m³/s)
Collection efficiency99.752 %
Area for the target15,537 m²

Open this example in the calculator and change any input.

Formula

\(\eta = 1 - \exp\left(-\frac{wA}{\dot V}\right), \quad A_t = -\frac{\dot V}{w}\ln(1 - \eta_t)\)

Variables

Symbol Meaning SI unit
\(w\) Effective migration velocity m/s
\(A\) Collecting plate area m²
\(\dot V\) Gas flow (actual) m³/s
\(\eta_t\) Target efficiency -
\(SCA\) Specific collecting area A/Q, in m² per m³/s (× 5.08 = ft² per 1000 acfm) s/m
\(\eta\) Collection efficiency -
\(A_t\) Area for the target m²

Method and standards

Deutsch–Anderson.

Where it is used

  • ESP checks and upgrades.
  • Boiler emission compliance.

Common mistakes

  • Normal instead of actual flow.
  • Test w applied to a different coal.

Assumptions and limits

  • Uniform gas distribution.
  • SCA is in m² per m³/s in every unit system; multiply by 5.08 for ft² per 1 000 acfm.

References

  • Deutsch–Anderson η = 1 − exp(−wA/Q)

Questions and answers

15,000 m² at 150 m³/s with w 0.06 m/s?

99.75 %; 99.8 % needs 15,537 m².

Why does area grow fast at high efficiency?

Each extra 'nine' needs the same added SCA.

High-resistivity ash?

Lower w: low-sulphur coal ash often needs more area or flue gas conditioning.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.