FireCADCalc

Activated Carbon Adsorber: Bed Life and Carbon Use

Bed life of an activated carbon adsorber for a VOC from the carbon mass, working capacity and VOC load, with contact time and the carbon used per year.

Thermal power plantSugar mill and cogenerationDistillery and ethanolRefinery and petrochemicalChemical and fertiliserPulp and paper

Inputs

Examples: 3000 m3/h at 500 mg/m3, 2 m3 bedTank vent 200 m3/h at 2 g/m3

Results

Working capacity is well below the equilibrium capacity (often a third to a half) because of the mass-transfer zone and humidity; take it from the supplier's isotherm at the gas humidity. Keep relative humidity below about 50 %.

Carbon in the bed480.00kg
VOC load0.40000kg/h
Bed life (operating hours)180.00h
Bed life (calendar days)7.5000
Contact time18.000s
Carbon used per year (365 days)23.360t

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 3000 m3/h at 500 mg/m3, 2 m3 bed. The inputs, in the units selected above:

InputValue
Gas flow (same conditions as the concentration: both actual or both normal)3,000.0 m³/h
VOC concentration500.00 mg/m³
Bed volume2.0000 m³
Carbon bulk density450.00 kg/m³
Working capacity (kg VOC per kg carbon)0.10000 kg/kg
Operating hours per day16.000 h

Applying the formula below gives:

ResultValue
Carbon in the bed900.00 kg
VOC load1.5000 kg/h
Bed life (operating hours)60.000 h
Bed life (calendar days)3.7500
Contact time2.4000 s
Carbon used per year (365 days)87.600 t

Open this example in the calculator and change any input.

Formula

\(t_b = \frac{m_cw_c}{QC}, \quad m_c = \rho_bV, \quad t_c = \frac{V}{Q}\)

Variables

Symbol Meaning SI unit
\(Q\) Gas flow (same conditions as the concentration: both actual or both normal) m³/s
\(C\) VOC concentration kg/m³
\(V\) Bed volume m³
\(\rho_b\) Carbon bulk density kg/m³
\(w_c\) Working capacity (kg VOC per kg carbon) kg/kg
\(h_d\) Operating hours per day s
\(m_c\) Carbon in the bed kg
\(\dot m_{VOC}\) VOC load kg/s
\(t_b\) Bed life (operating hours) s
\(t_d\) Bed life (calendar days) -
\(t_c\) Contact time s
\(\dot m_{c,yr}\) Carbon used per year (365 days) kg

Method and standards

Mass balance.

Where it is used

  • Solvent and odour vents.
  • Tank breathing and loading emissions.

Common mistakes

  • Using equilibrium capacity.
  • Ignoring humidity.

Assumptions and limits

  • Constant load; working capacity from data.
  • Flow and concentration on one basis: both at actual conditions or both at normal conditions (m³ at 0 °C, 1 atm).

References

  • Cooper and Alley
  • Air Pollution Control: A Design Approach
  • 4th ed. (Waveland, 2011)
  • ch. 12 (adsorption: working capacity and bed life)

Questions and answers

What is working capacity?

The VOC a bed actually holds before breakthrough, below the equilibrium capacity because part of the bed is in the mass-transfer zone.

Why does humidity matter?

Water competes for pores; above about 50 % relative humidity carbon capacity for VOCs falls sharply.

What do the defaults give?

3,000 m³/h at 500 mg/m³ on 900 kg of carbon at 10 %: 60 operating hours, about 4 days at 16 h/day.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.