Worked example
Example: Illustrative seven offsets at 10 m. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Offset spacing | 10.000 m |
| Number of offsets used (2–7) | 7.0000 - |
| Offset 1 | 0 m |
| Offset 2 | 2.6500 m |
| Offset 3 | 3.8000 m |
| Offset 4 | 3.7500 m |
| Offset 5 | 4.6500 m |
| Offset 6 | 3.6000 m |
| Offset 7 | 4.9500 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Area, trapezoidal rule | 209.25 m² |
| Area, Simpson's rule (trapezoid on a last odd strip) | 206.17 m² |
| Area, average ordinate rule | 200.57 m² |
| Length of the base line | 60.000 m |
Open this example in the calculator and change any input.
Formula
\(A_T = d\left[\frac{o_1 + o_n}{2} + \sum_{i=2}^{n-1}o_i\right], \quad A_S = \frac d3\left[o_1 + o_n + 4\sum o_{even} + 2\sum o_{odd}\right]\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(d\) | Offset spacing | m |
| \(n\) | Number of offsets used (2–7) | - |
| \(o_1\) | Offset 1 | m |
| \(o_2\) | Offset 2 | m |
| \(o_3\) | Offset 3 | m |
| \(o_4\) | Offset 4 | m |
| \(o_5\) | Offset 5 | m |
| \(o_6\) | Offset 6 | m |
| \(o_7\) | Offset 7 | m |
| \(A_T\) | Area, trapezoidal rule | m² |
| \(A_S\) | Area, Simpson's rule (trapezoid on a last odd strip) | m² |
| \(A_O\) | Area, average ordinate rule | m² |
| \(L\) | Length of the base line | m |
Method and standards
Offset areas.
Where it is used
- Areas along roads, rivers and boundaries.
- Cross-section areas for earthwork.
Common mistakes
- Applying Simpson's to an odd number of strips.
- Unequal offset spacing.
Assumptions and limits
- Equal spacing; offsets perpendicular to the base line.
References
- Offset area rules
Questions and answers
Which rule is more accurate?
Simpson's for curved boundaries, the trapezoidal rule for straight-sided ones.
Why does Simpson's need an odd number of offsets?
It fits a parabola through each set of three offsets, which needs pairs of strips.
What do the defaults represent?
Illustrative chain-survey offsets of 0, 2.65, 3.80, 3.75, 4.65, 3.60 and 4.95 m at 10 m intervals.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Punmia, Jain and Jain, Surveying, Vol. 1, 16th ed. (Laxmi, 2005)