FireCADCalc

Pile Capacity by the Hiley Driving Formula

Ultimate and safe load of a driven pile from hammer weight, drop, efficiency, final set, temporary compression, pile weight and coefficient of restitution.

Inputs

Examples: Illustrative drop hammer on a concrete pileHeavy pile, light hammerSteel H-pile, diesel hammer

Accepted: 0.1 to 10,000 kN
Accepted: 0.01 to 10 m
Accepted: 10 to 100 %
Accepted: 0 to 200 mm
Accepted: 0 to 100 mm
Accepted: 0 to 10,000 kN
Accepted: 0 to 1
Accepted: 1 to 10

Results

Hiley equates the energy delivered to the pile, η_hWh times the efficiency of the blow, to the work done against the soil resistance over the permanent set plus half the temporary (elastic) compression: R_u = η_hWh·η_b/(s + c/2). For W > e_rP, η_b = (W + e_r²P)/(W + P); for heavier piles a further term is subtracted. Measure the set as the average over the last ten blows and the temporary compression from a pencil trace on the pile. Dynamic formulas are unreliable in clay (set-up and relaxation); confirm by load tests or dynamic monitoring.

Ultimate driving resistance1,945.6kN
Safe load778.24kN
Efficiency of the blow60.800%
Energy per blow at the pile19.456kJ

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative drop hammer on a concrete pile. The inputs, in the units selected above:

InputValue
Hammer (ram) weight40.000 kN
Drop of the hammer1.0000 m
Hammer efficiency80.000 %
Final set per blow2.5000 mm
Total temporary compression (pile, cap, soil)15.000 mm
Pile weight (with helmet)35.000 kN
Coefficient of restitution0.40000 -
Factor of safety2.5000 -

Applying the formula below gives:

ResultValue
Ultimate driving resistance1,945.6 kN
Safe load778.24 kN
Efficiency of the blow60.800 %
Energy per blow at the pile19.456 kJ

Open this example in the calculator and change any input.

Formula

\(R_u = \frac{\eta_hWh}{s + c/2}\cdot\frac{W + e_r^2P}{W + P}\)

Variables

Symbol Meaning SI unit
\(W\) Hammer (ram) weight N
\(h\) Drop of the hammer m
\(\eta_h\) Hammer efficiency -
\(s\) Final set per blow m
\(c\) Total temporary compression (pile, cap, soil) m
\(P\) Pile weight (with helmet) N
\(e_r\) Coefficient of restitution -
\(F\) Factor of safety -
\(R_u\) Ultimate driving resistance N
\(R_a\) Safe load N
\(\eta_b\) Efficiency of the blow -
\(E\) Energy per blow at the pile J

Method and standards

Hiley formula.

Where it is used

  • Driving control of precast and steel piles.
  • Setting the final set for a required capacity.

Common mistakes

  • Using the set from a single blow.
  • Applying it to piles in clay without tests.

Assumptions and limits

  • Impact theory with restitution; sand or gravel ground; set from the final blows.

References

  • Hiley pile-driving formula

Questions and answers

Why is the formula unreliable in clay?

Clays gain strength after driving (set-up) and resist differently under impact than under static load.

What restitution coefficient should I use?

About 0.5 for steel on steel without cushion, 0.4 for concrete piles with a helmet and packing, 0.25 for timber.

What do the defaults represent?

An illustrative 40 kN drop hammer falling 1 m at 80 % efficiency onto a 35 kN concrete pile, 2.5 mm set and 15 mm temporary compression.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Tomlinson and Woodward, Pile Design and Construction Practice, 6th ed. (CRC Press, 2014)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.