FireCADCalc

Yarn Required for a Woven Fabric Order

Warp and weft yarn needed for a length of woven fabric from total ends, picks per cm, reed width, yarn tex, crimp and process waste.

Food, dairy and textile

Inputs

Examples: 10 000 m shirting, 6000 endsDenim 5000 m

Results

Weft crimp is already in the reed width (wider than the cloth); add selvedge ends to the total ends.

Warp yarn1,777.8kg
Weft yarn1,375.9kg
Total yarn3,153.7kg
Yarn per metre of fabric0.63074kg/m

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 10 000 m shirting, 6000 ends. The inputs, in the units selected above:

InputValue
Fabric length ordered10,000 m
Total warp ends6,000.0 -
Picks per cm30.000 -
Reed width (weft length per pick)1.6000 m
Warp tex20.000 -
Weft tex25.000 -
Warp crimp8.0000 %
Process waste allowance3.0000 %

Applying the formula below gives:

ResultValue
Warp yarn1,334.9 kg
Weft yarn1,236.0 kg
Total yarn2,570.9 kg
Yarn per metre of fabric0.25709 kg/m

Open this example in the calculator and change any input.

Formula

\(M_w = L_f(1 + c_w)n_eT_w(1 + w), \quad M_f = L_fn_pW_rT_f(1 + w)\ \ (T\ \text{in g/km})\)

Variables

Symbol Meaning SI unit
\(L_f\) Fabric length ordered m
\(n_e\) Total warp ends -
\(n_p\) Picks per cm -
\(W_r\) Reed width (weft length per pick) m
\(T_w\) Warp tex -
\(T_f\) Weft tex -
\(c_w\) Warp crimp -
\(w\) Process waste allowance -
\(M_w\) Warp yarn kg
\(M_f\) Weft yarn kg
\(M\) Total yarn kg
\(M/L_f\) Yarn per metre of fabric kg/m

Method and standards

Yarn length balance.

Where it is used

  • Fabric costing and yarn ordering.

Common mistakes

  • Using cloth width for weft.
  • Forgetting selvedge ends.

Assumptions and limits

  • Plain or simple weaves.
  • The waste allowance w is added on the net requirement, (1 + w). If w is a share of the yarn issued, the factor is 1/(1 − w), slightly larger.

References

  • Definitions: yarn length × linear density
  • with warp crimp and waste

Questions and answers

Why use reed width for weft?

Each pick spans the reed width, which already includes the weft crimp.

What waste allowance is usual?

2–4 % for warping, sizing and weaving waste.

Why is warp crimp needed?

The warp is longer than the cloth because it bends over and under the weft.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.