Fly Ash Silo: Storage Volume, Size and Conditioning Water

Fly ash silo volume, diameter and height for a storage time from ash rate, bulk density and fill fraction, with conditioning water for truck loading.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paper

Inputs

Examples: 15 t/h for 24 h40 t/h for 12 h

Results

Cylinder volume only; the cone below and the dead space above the fill line are covered by the fill fraction. Moisture is added on a wet basis (w = water/(ash + water)).

Ash stored480.00t
Silo volume (gross)705.88m³
Silo diameter9.0814m
Cylinder height10.898m
Conditioning water while unloading20.455t/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 15 t/h for 24 h. The inputs, in the units selected above:

InputValue
Fly ash rate15.000 t/h
Storage time24.000 h
Bulk density in the silo750.00 kg/m³
Usable fill fraction85.000 %
Cylinder height-to-diameter ratio1.5000 -
Moisture added for conditioning15.000 %
Unloading rate to trucks (dry ash)100.00 t/h

Applying the formula below gives:

ResultValue
Ash stored360.00 t
Silo volume (gross)564.71 m³
Silo diameter7.8261 m
Cylinder height11.739 m
Conditioning water while unloading17.647 t/h

Open this example in the calculator and change any input.

Formula

\(M = \dot m_at, \quad V = \frac{M}{\rho_bf}, \quad D = \sqrt[3]{\frac{4V}{\pi(H/D)}}, \quad H = (H/D)\,D, \quad \dot m_w = \dot m_{ul}\frac{w}{1 - w}\)

Variables

Symbol Meaning SI unit
\(\dot m_a\) Fly ash rate kg/s
\(t\) Storage time s
\(\rho_b\) Bulk density in the silo kg/m³
\(f\) Usable fill fraction -
\(H/D\) Cylinder height-to-diameter ratio -
\(w\) Moisture added for conditioning -
\(\dot m_{ul}\) Unloading rate to trucks kg/s
\(M\) Ash stored kg
\(V\) Silo volume (gross) m³
\(D\) Silo diameter m
\(H\) Cylinder height m
\(\dot m_w\) Conditioning water while unloading kg/s

Method and standards

Storage and moisture balance.

Where it is used

  • Ash handling plant design.
  • Checking silo capacity after a fuel change.

Common mistakes

  • Using aerated density for storage.
  • Forgetting moisture on a wet basis.

Assumptions and limits

  • Cylinder section only: the whole gross volume is put in the cylinder, so a real silo with a hopper cone is a little smaller in cylinder height.
  • The unloading rate is dry ash; the conditioning water is added on a wet basis.

References

  • Volume and moisture balance definitions

Questions and answers

How many hours of storage?

Commonly 12–24 h of maximum ash rate, more where trucks do not run at night.

Why condition the ash?

Dry fly ash dusts badly; 10–20 % water in a conditioner (pug mill) lets it be trucked.

What do the defaults give?

15 t/h for 24 h: 360 t, about 565 m³ gross, a silo of about 7.8 m diameter and 11.7 m cylinder height.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.