Worked example
Example: Drum feeders on bagasse. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Feeder width | 0.60000 m |
| Fuel bed height | 0.25000 m |
| Feeder surface speed | 6.0000 m/min |
| Fuel bulk density | 140.00 kg/m³ |
| Fuel firing rate | 30.000 t/h |
| Spare feeders | 1.0000 - |
| Fill and slip factor (1 = full bed, no slip) | 100.00 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| One feeder | 7.5600 t/h |
| Feeders in service | 4.0000 |
| Feeders installed | 5.0000 |
Open this example in the calculator and change any input.
Formula
\(\dot m_1 = \phi\,\rho_b W H v, \quad N = \lceil \dot m_f / \dot m_1 \rceil\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(W\) | Feeder width | m |
| \(H\) | Fuel bed height | m |
| \(v\) | Feeder surface speed | m/s |
| \(\rho_b\) | Fuel bulk density | kg/m³ |
| \(\dot m_f\) | Fuel firing rate | kg/s |
| \(n_s\) | Spare feeders | - |
| \(\phi\) | Fill and slip factor | - |
| \(\dot m_1\) | One feeder | kg/s |
| \(N\) | Feeders in service | - |
| \(N_t\) | Feeders installed | - |
Method and standards
Volumetric feed.
Where it is used
- Feeder selection.
- Fuel system debottlenecking.
Common mistakes
- Loose and compacted density mixed.
Assumptions and limits
- The fill and slip factor (default 1, full bed) and the spares carry any design margin; with 1 the feeders in service run at 100 % of their volumetric rating.
References
- Volumetric throughput ṁ = ρ W H v
Questions and answers
Why several feeders?
They spread fuel across the grate and allow one to stop without losing the boiler.
Speed control?
VFDs on feeders follow the steam pressure.
Why does bulk density matter?
A feeder moves volume; mass depends on how the bagasse packs.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.