FireCADCalc

Cane Shredder Power from Fibre Rate

Fibre throughput, shredder power and power per tonne of cane per hour from the crushing rate, fibre % cane and the specific power per tonne of fibre.

Sugar mill and cogeneration

Inputs

Examples: 250 TCH, 60 kW per t fibre/hHigh fibre

Power expended (absorbed) in kW per t fibre/h, from tests; Hugot's good preparation needs 50–80. Installed power overstates the index.

Results

The preparation index fit (Hugot p. 62) has a correlation of only 0.66: use it as a trend. W is the power expended (absorbed); installed power overstates the index.

Fibre throughput24.750t/h
Shredder power1,361.2kW
Power per tonne of cane per hour9.0750kWh/t
Expected preparation index 63.7 W^0.09 (W in kW per t fibre/h)91.363%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 250 TCH, 60 kW per t fibre/h. The inputs, in the units selected above:

InputValue
Crushing rate250.00 t/h
Fibre % cane14.500 %
Specific power per tonne of fibre60.000 kWh/t

Applying the formula below gives:

ResultValue
Fibre throughput36.250 t/h
Shredder power2,175.0 kW
Power per tonne of cane per hour8.7000 kWh/t
Expected preparation index 63.7 W^0.09 (W in kW per t fibre/h)92.082 %

Open this example in the calculator and change any input.

Formula

\(\dot m_F = C F_c, \quad P = \dot m_F e_F, \quad I.P. \approx 63.7\,W^{0.09}\ \%\ (W = e_F\ \text{in kW per t fibre/h})\)

Variables

Symbol Meaning SI unit
\(C\) Crushing rate kg/s
\(F_c\) Fibre % cane -
\(e_F\) Specific power per tonne of fibre J/kg
\(\dot m_F\) Fibre throughput kg/s
\(P\) Shredder power W
\(P/C\) Power per tonne of cane per hour J/kg
\(I.P.\) Expected preparation index 63.7 W^0.09 (W in kW per t fibre/h) -

Method and standards

Definitions.

Where it is used

  • Shredder drive sizing.
  • Energy audits.

Common mistakes

  • kW per t cane mistaken for per t fibre.

Assumptions and limits

  • Steady feed.
  • In the preparation-index fit W is the power expended for preparation (absorbed), in kW per t fibre/h; Hugot tabulates it for 10–80 and finds a good index at 50–80. The default 60 is in that band. Outside 10–80 the index is extrapolated, and above 100 % it is capped; both are flagged.

References

  • P = ṁ_F e_F; specific power by maker or test (Rein, Cane Sugar Engineering)
  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (1986)
  • ch. 6
  • preparation index against power
  • p. 62

Questions and answers

Why per tonne of fibre?

The shredder breaks fibre; juice passes for free.

Installed or absorbed?

State which: installed power carries a margin over absorbed.

Turbine or motor?

Both are used; see the mill drive comparison.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.