Worked example
Example: 3750 t at 300 kg/m3. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Cane stock | 3,750.0 t |
| Bulk density of the stacked cane | 300.00 kg/m³ |
| Mean stack height | 3.0000 m |
| Share of the yard area that holds cane | 60.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Stack volume | 12,500 m³ |
| Area under cane | 4,166.7 m² |
| Gross yard area | 6,944.4 m² |
Open this example in the calculator and change any input.
Formula
\(V = \frac{P}{\rho_b}, \quad A_n = \frac{V}{H}, \quad A_g = \frac{A_n}{u}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P\) | Cane stock | kg |
| \(\rho_b\) | Bulk density of the stacked cane | kg/m³ |
| \(H\) | Mean stack height | m |
| \(u\) | Share of the yard area that holds cane | - |
| \(V\) | Stack volume | m³ |
| \(A_n\) | Area under cane | m² |
| \(A_g\) | Gross yard area | m² |
Method and standards
Mass, volume and area for a stack of mean height H.
Where it is used
- Laying out cane yards.
- Checking yard capacity for a crush expansion.
Common mistakes
- Using the density of cane in trucks for loose stacks.
- Taking the peak stack height as the mean height.
Assumptions and limits
- Mean stack height over the whole cane area. A note appears for a bulk density outside Hugot's 200–400 kg/m³.
References
- Hugot
- Handbook of Cane Sugar Engineering
- 3rd ed. (Elsevier, 1986)
- ch. 1
- bulk densities of cane
- p. 1
Questions and answers
Which bulk density?
It depends on how the cane is loaded: Hugot gives about 200 kg/m³ for grab-loaded whole cane and 300–380 for chopped cane.
Why an allowance for roads?
Cranes, unloaders and vehicles need room; often only half to two-thirds of the yard holds cane.
Does the stack height matter?
Yes: area falls in proportion, but high stacks crush the bottom cane and slow unloading.