FireCADCalc

Cane Transport Fleet: Trips and Vehicles

Daily trips and vehicles needed to haul the crush from payload, turnaround time, working hours and availability, rounded up to whole vehicles.

Sugar mill and cogeneration

Inputs

Examples: 5000 TCD, 10 t trucksTractor trailers

The daily crush (tonnes per day).

Results

Each vehicle is credited only with whole trips in the working day; round turnarounds up, not down.

Trips per day500.00
Whole trips per vehicle per day3.0000
Vehicles needed (rounded up)197.00
Vehicles needed (exact)196.08

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 5000 TCD, 10 t trucks. The inputs, in the units selected above:

InputValue
Cane to deliver per day5,000.0 t/d
Payload per trip10.000 t
Turnaround time per trip (load, haul, unload, return)4.0000 h
Working hours per day12.000 h
Fleet availability85.000 %

Applying the formula below gives:

ResultValue
Trips per day500.00
Whole trips per vehicle per day3.0000
Vehicles needed (rounded up)197.00
Vehicles needed (exact)196.08

Open this example in the calculator and change any input.

Formula

\(N_t = \frac{C_d \cdot 1\,\mathrm{d}}{W}, \quad n = \left\lfloor \frac{H_d}{T} \right\rfloor, \quad N_v = \left\lceil \frac{N_t}{n\,\alpha} \right\rceil\)

Variables

Symbol Meaning SI unit
\(C_d\) Cane to deliver per day kg/s
\(W\) Payload per trip kg
\(T\) Turnaround time per trip (load, haul, unload, return) s
\(H_d\) Working hours per day s
\(\alpha\) Fleet availability -
\(N_t\) Trips per day -
\(n\) Whole trips per vehicle per day -
\(N_v\) Vehicles needed (rounded up) -
\(N_f\) Vehicles needed (exact) -

Method and standards

Haulage arithmetic.

Where it is used

  • Season transport planning.
  • Checking contractors' fleet offers.

Common mistakes

  • Using the vehicle's rated payload instead of the average delivered load.
  • Ignoring queueing time at the mill.

Assumptions and limits

  • Average turnaround over the day. Each vehicle makes only whole trips in its working day (n is rounded down).
  • C_d is the daily tonnage (1 d = 86 400 s).

References

  • Haulage arithmetic: trips = daily tonnage / payload; vehicles = trips / (trips per vehicle × availability)

Questions and answers

What goes into the turnaround?

Waiting and loading in the field, haul, queue and weighing at the mill, unloading, and the return trip.

Why availability?

Vehicles break down and drivers rest; 80–90 % is a common planning figure.

Does the yard stock change the fleet?

Only the delivery hours: a fleet working fewer hours per day needs more vehicles.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.