Safety Function Average Probability of Failure on Demand

Average probability of failure on demand for 1oo1, 1oo2 and 2oo3 voting from failure rate, proof-test interval and common cause, with the SIL band.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationDistillery and ethanolRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 1oo1, 2e-6/h, yearly test1oo2, β 5 %2oo3, β 10 %, 2-year test

Results

SIL band from PFDavg only: architectural constraints (hardware fault tolerance, safe failure fraction) and systematic capability are not checked.

Simplified equations for low-demand mode (IEC 61508-6 / ISA-TR84 forms) neglecting repair time and diagnostics. A full SIL verification adds all elements, architectural constraints and systematic capability.

Average probability of failure on demand5.3034e-04
Risk reduction factor1,885.6
SIL band met by this element (0 = below SIL 1)3.0000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1oo1, 2e-6/h, yearly test. The inputs, in the units selected above:

InputValue
Dangerous undetected failure rate (per hour)2.0000e-06 -
Proof-test interval8,760.0 h
Architecture1oo1
Common-cause factor5.0000 %

Applying the formula below gives:

ResultValue
Average probability of failure on demand0.008760
Risk reduction factor114.16
SIL band met by this element (0 = below SIL 1)2.0000

Open this example in the calculator and change any input.

Formula

\(PFD_{1oo1} = \frac{\lambda_{DU}T_I}{2}, \quad PFD_{1oo2} = \frac{[(1 - \beta)\lambda_{DU}T_I]^2}{3} + \beta\frac{\lambda_{DU}T_I}{2}, \quad PFD_{2oo3} = [(1 - \beta)\lambda_{DU}T_I]^2 + \beta\frac{\lambda_{DU}T_I}{2}, \quad RRF = \frac{1}{PFD_{avg}}\)

Variables

Symbol Meaning SI unit
\(\lambda_{DU}\) Dangerous undetected failure rate (per hour) -
\(T_I\) Proof-test interval s
\(\text{voting}\) Architecture -
\(\beta\) Common-cause factor -
\(PFD_{avg}\) Average probability of failure on demand -
\(RRF\) Risk reduction factor -
\(SIL\) SIL band met by this element (0 = below SIL 1) -

Method and standards

Simplified low-demand equations.

Where it is used

  • Safety instrumented function screening.
  • Choosing redundancy and test intervals.

Common mistakes

  • Using total instead of dangerous undetected failure rate.
  • Forgetting common cause in redundant designs.

Assumptions and limits

  • Low demand; perfect proof tests; no repair time.
  • λT must be small: rejected at 1 or more, warned above 0.1.
  • SIL band from PFDavg alone; architectural constraints (HFT, SFF) and systematic capability are not considered.

References

  • Simplified PFDavg equations (1oo1: λT/2; 1oo2: ((1 − β)λT)²/3 + βλT/2; 2oo3: ((1 − β)λT)² + βλT/2)
  • as in IEC 61508-6 and ISA-TR84.00.02

Questions and answers

What do the SIL bands mean?

SIL 1: PFD 10⁻² to 10⁻¹; SIL 2: 10⁻³ to 10⁻²; SIL 3: 10⁻⁴ to 10⁻³ (low-demand mode).

Why does proof testing matter?

Undetected failures accumulate between tests; halving the test interval halves a 1oo1 PFD.

What do the defaults represent?

A transmitter with λ_DU = 2 × 10⁻⁶/h tested yearly, as 1oo1.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.