Step Test Model: Gain, Time Constant and Dead Time (Two-Point Method)

Process gain, time constant and dead time of a first-order plus dead-time model from a step test by Smith's two-point method (28.3 % and 63.2 % times).

Thermal power plantProcess steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 10 % step, 20 % change, 30 s and 70 s5 % step, −7.5 % change (reverse acting), 12 s and 25 s2 % step, 10 °C, 150 s and 450 s

Results

Express Δu and Δy in the same units (usually % of range) so the gain is dimensionless.

Process gain Δy / Δu5.0000
Time constant 1.5 (t₆₃ − t₂₈)450.00s
Dead time t₆₃ − τ0s
Controllability ratio θ/τ0

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 10 % step, 20 % change, 30 s and 70 s. The inputs, in the units selected above:

InputValue
Step in controller output10.000 -
Final change in the measured variable20.000 -
Time to 28.3 % of the change (from the step)30.000 s
Time to 63.2 % of the change70.000 s

Applying the formula below gives:

ResultValue
Process gain Δy / Δu2.0000
Time constant 1.5 (t₆₃ − t₂₈)60.000 s
Dead time t₆₃ − τ10.000 s
Controllability ratio θ/τ0.16667

Open this example in the calculator and change any input.

Formula

\(\tau = 1.5\,(t_{63} - t_{28}), \quad \theta = t_{63} - \tau, \quad K_p = \frac{\Delta y}{\Delta u}\)

Variables

Symbol Meaning SI unit
\(\Delta u\) Step in controller output -
\(\Delta y\) Final change in the measured variable -
\(t_{28}\) Time to 28.3 % of the change (from the step) s
\(t_{63}\) Time to 63.2 % of the change s
\(K_p\) Process gain Δy / Δu -
\(\tau\) Time constant 1.5 (t₆₃ − t₂₈) s
\(\theta\) Dead time t₆₃ − τ s
\(\theta/\tau\) Controllability ratio θ/τ -

Method and standards

Two points on the first-order step response.

Where it is used

  • Loop tuning.
  • Process modelling.

Common mistakes

  • Timing from the wrong start.
  • Noisy data near the end.

Assumptions and limits

  • Self-regulating response.

References

  • C.L. Smith
  • Digital Computer Process Control (1972)
  • two-point method

Questions and answers

A 10 % step gives a 20 % change, reaching 28.3 % at 30 s and 63.2 % at 70 s. What model?

Gain 2, τ = 1.5 × 40 = 60 s, θ = 70 − 60 = 10 s.

Why 28.3 and 63.2 %?

They are θ + τ/3 and θ + τ on a first-order curve.

What is a hard process?

θ/τ above about 1: dead time dominates.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.