Worked example
Example: Illustrative six-pulse drive load. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Fundamental current at measurement | 600.00 A |
| Maximum demand current (12-month average) | 900.00 A |
| Short-circuit current at the supply point | 25,000 A |
| 3rd harmonic | 15.000 A |
| 5th harmonic | 140.00 A |
| 7th harmonic | 70.000 A |
| 9th harmonic | 5.0000 A |
| 11th harmonic | 40.000 A |
| 13th harmonic | 28.000 A |
Applying the formula below gives:
| Result | Value |
|---|---|
| Total harmonic current (rms) | 164.72 A |
| Total demand distortion | 18.303 % |
| Current THD | 27.454 % |
| Short-circuit ratio | 27.778 |
Open this example in the calculator and change any input.
Formula
\(TDD = \frac{\sqrt{\sum_h I_h^2}}{I_L}, \quad THD_I = \frac{\sqrt{\sum_h I_h^2}}{I_1}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(I_1\) | Fundamental current at measurement | A |
| \(I_L\) | Maximum demand current (12-month average) | A |
| \(I_{sc}\) | Short-circuit current at the supply point | A |
| \(I_3\) | 3rd harmonic | A |
| \(I_5\) | 5th harmonic | A |
| \(I_7\) | 7th harmonic | A |
| \(I_9\) | 9th harmonic | A |
| \(I_{11}\) | 11th harmonic | A |
| \(I_{13}\) | 13th harmonic | A |
| \(I_H\) | Total harmonic current (rms) | A |
| \(TDD\) | Total demand distortion | - |
| \(THD_I\) | Current THD | - |
| \(I_{sc}/I_L\) | Short-circuit ratio | - |
Method and standards
Demand distortion.
Where it is used
- Utility harmonic compliance checks.
- Comparing drive harmonic solutions.
Common mistakes
- Dividing by the measured fundamental for TDD.
- Using instantaneous peak demand for I_L.
Assumptions and limits
- Orders entered dominate; rms values.
References
- Total demand distortion definition
Questions and answers
Why use TDD instead of THD?
THD rises at light load even though harmonic amps fall; TDD relates harmonic amps to the full demand the system is built for.
What is I_L?
The average of the monthly maximum demand currents over a year, or the design demand for a new plant.
What do the defaults represent?
An illustrative six-pulse drive load: 600 A fundamental, 900 A maximum demand, 25 kA fault current, with typical 5th, 7th, 11th and 13th harmonics.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Dugan, McGranaghan, Santoso and Beaty, Electrical Power Systems Quality, 3rd ed. (McGraw-Hill, 2012)