Capacitor Bank Switching Inrush Current and Frequency

Peak inrush current and frequency when energising an isolated capacitor bank, and back-to-back when another bank is already on through a small inductance.

Thermal power plantProcess steam and utilities

Inputs

Examples: Illustrative 3 Mvar 11 kV, back-to-backLV 300 kvar isolated33 kV 10 Mvar next to 5 Mvar

Accepted: 0.2 to 800 kV
Accepted: 40 to 70 Hz
Accepted: 0.001 to 1,000 Mvar
Accepted: 1 to 100,000 MVA
Accepted: 0 to 1,000 Mvar
Accepted: 0.1 to 10,000 µH

Results

Isolated: Î = √2·I_r√(S_sc/Q), f = f₀√(S_sc/Q). Back-to-back: Î = √(2/3)·V√(C_eq/L_b) with star-equivalent capacitances in series, limited only by the bus and cable inductance between banks; current-limiting reactors keep it within switchgear and capacitor ratings.

Rated bank current157.46A
Peak inrush, isolated bank2.0328kA
Inrush frequency, isolated bank456.44Hz
Peak inrush, back-to-back12.616kA
Inrush frequency, back-to-back5.6654kHz

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 3 Mvar 11 kV, back-to-back. The inputs, in the units selected above:

InputValue
System voltage (line-to-line)11.000 kV
Frequency50.000 Hz
Bank being switched3.0000 Mvar
Short-circuit level at the bank250.00 MVA
Bank already energised (0 if none)3.0000 Mvar
Inductance between the banks20.000 µH

Applying the formula below gives:

ResultValue
Rated bank current157.46 A
Peak inrush, isolated bank2.0328 kA
Inrush frequency, isolated bank456.44 Hz
Peak inrush, back-to-back12.616 kA
Inrush frequency, back-to-back5.6654 kHz

Open this example in the calculator and change any input.

Formula

\(\hat I_{iso} = \sqrt2I_r\sqrt{\frac{S_{sc}}{Q}}, \quad \hat I_{b2b} = \sqrt{\tfrac23}V\sqrt{\frac{C_{eq}}{L_b}}, \quad f_{b2b} = \frac{1}{2\pi\sqrt{L_bC_{eq}}}\)

Variables

Symbol Meaning SI unit
\(V\) System voltage (line-to-line) V
\(f\) Frequency 1/s
\(Q_1\) Bank being switched var
\(S_{sc}\) Short-circuit level at the bank VA
\(Q_2\) Bank already energised (0 if none) var
\(L_b\) Inductance between the banks H
\(I_r\) Rated bank current A
\(\hat I_{iso}\) Peak inrush, isolated bank A
\(f_{iso}\) Inrush frequency, isolated bank 1/s
\(\hat I_{b2b}\) Peak inrush, back-to-back A
\(f_{b2b}\) Inrush frequency, back-to-back 1/s

Method and standards

Switching transients.

Where it is used

  • Capacitor bank and switchgear selection.
  • Inrush reactor sizing.

Common mistakes

  • Ignoring back-to-back cases.
  • Using source inductance for back-to-back inrush.

Assumptions and limits

  • Lossless circuit; switching at voltage peak (worst case).

References

  • Capacitor switching transients

Questions and answers

Why is back-to-back switching so severe?

The charged bank discharges into the new one through only a few microhenries, giving kiloamp peaks at kilohertz frequencies.

How is it limited?

Series inrush reactors, pre-insertion resistors, or synchronised (point-on-wave) switching.

What do the defaults represent?

An illustrative 3 Mvar, 11 kV bank energised on a 250 MVA bus next to another 3 Mvar bank through 20 µH.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dugan, McGranaghan, Santoso and Beaty, Electrical Power Systems Quality, 2nd ed. (McGraw-Hill, 2002), ch. 4

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.