Worked example
Example: Illustrative 3 Mvar 11 kV, back-to-back. The inputs, in the units selected above:
| Input | Value |
|---|---|
| System voltage (line-to-line) | 11.000 kV |
| Frequency | 50.000 Hz |
| Bank being switched | 3.0000 Mvar |
| Short-circuit level at the bank | 250.00 MVA |
| Bank already energised (0 if none) | 3.0000 Mvar |
| Inductance between the banks | 20.000 µH |
Applying the formula below gives:
| Result | Value |
|---|---|
| Rated bank current | 157.46 A |
| Peak inrush, isolated bank | 2.0328 kA |
| Inrush frequency, isolated bank | 456.44 Hz |
| Peak inrush, back-to-back | 12.616 kA |
| Inrush frequency, back-to-back | 5.6654 kHz |
Open this example in the calculator and change any input.
Formula
\(\hat I_{iso} = \sqrt2I_r\sqrt{\frac{S_{sc}}{Q}}, \quad \hat I_{b2b} = \sqrt{\tfrac23}V\sqrt{\frac{C_{eq}}{L_b}}, \quad f_{b2b} = \frac{1}{2\pi\sqrt{L_bC_{eq}}}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V\) | System voltage (line-to-line) | V |
| \(f\) | Frequency | 1/s |
| \(Q_1\) | Bank being switched | var |
| \(S_{sc}\) | Short-circuit level at the bank | VA |
| \(Q_2\) | Bank already energised (0 if none) | var |
| \(L_b\) | Inductance between the banks | H |
| \(I_r\) | Rated bank current | A |
| \(\hat I_{iso}\) | Peak inrush, isolated bank | A |
| \(f_{iso}\) | Inrush frequency, isolated bank | 1/s |
| \(\hat I_{b2b}\) | Peak inrush, back-to-back | A |
| \(f_{b2b}\) | Inrush frequency, back-to-back | 1/s |
Method and standards
Switching transients.
Where it is used
- Capacitor bank and switchgear selection.
- Inrush reactor sizing.
Common mistakes
- Ignoring back-to-back cases.
- Using source inductance for back-to-back inrush.
Assumptions and limits
- Lossless circuit; switching at voltage peak (worst case).
References
- Capacitor switching transients
Questions and answers
Why is back-to-back switching so severe?
The charged bank discharges into the new one through only a few microhenries, giving kiloamp peaks at kilohertz frequencies.
How is it limited?
Series inrush reactors, pre-insertion resistors, or synchronised (point-on-wave) switching.
What do the defaults represent?
An illustrative 3 Mvar, 11 kV bank energised on a 250 MVA bus next to another 3 Mvar bank through 20 µH.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Dugan, McGranaghan, Santoso and Beaty, Electrical Power Systems Quality, 2nd ed. (McGraw-Hill, 2002), ch. 4