FireCADCalc

Voltage Unbalance: NEMA and Negative-Sequence (IEC) Methods

Voltage unbalance of a three-phase supply from the three line-to-line voltages, as NEMA maximum deviation from the average and as the negative-sequence ratio.

Thermal power plantProcess steam and utilitiesElectric motor

Inputs

Examples: 415, 410, 400 V440, 430, 415 V11 kV bus: 11.2, 10.9, 11.0 kV

Results

Motor derating for unbalance comes from the motor standard or maker; this page gives the unbalance only.

Average line voltage408.33V
Largest deviation from the average8.3333V
Unbalance, NEMA (largest deviation ÷ average)2.0408%
Unbalance factor, negative ÷ positive sequence2.1540%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 415, 410, 400 V. The inputs, in the units selected above:

InputValue
Line-to-line voltage a–b415.00 V
Line-to-line voltage b–c410.00 V
Line-to-line voltage c–a400.00 V

Applying the formula below gives:

ResultValue
Average line voltage408.33 V
Largest deviation from the average8.3333 V
Unbalance, NEMA (largest deviation ÷ average)2.0408 %
Unbalance factor, negative ÷ positive sequence2.1540 %

Open this example in the calculator and change any input.

Formula

\(V_{avg} = \frac{V_{ab} + V_{bc} + V_{ca}}{3}, \quad LVUR = \frac{\Delta V_{max}}{V_{avg}}\)

\(\beta = \frac{V_{ab}^4 + V_{bc}^4 + V_{ca}^4}{(V_{ab}^2 + V_{bc}^2 + V_{ca}^2)^2}, \quad VUF = \sqrt{\frac{1 - \sqrt{3 - 6\beta}}{1 + \sqrt{3 - 6\beta}}}\)

Variables

Symbol Meaning SI unit
\(V_{ab}\) Line-to-line voltage a–b V
\(V_{bc}\) Line-to-line voltage b–c V
\(V_{ca}\) Line-to-line voltage c–a V
\(V_{avg}\) Average line voltage V
\(\Delta V_{max}\) Largest deviation from the average V
\(LVUR\) Unbalance, NEMA (largest deviation ÷ average) -
\(VUF\) Unbalance factor, negative ÷ positive sequence -

Method and standards

The NEMA unbalance uses the line voltages directly. The negative-to-positive sequence ratio is computed from the three line-to-line magnitudes by the closed form above, which equals the symmetrical-component ratio (line voltages always form a closed triangle, so they have no zero sequence).

Where it is used

  • Checking a supply before commissioning motors.
  • Diagnosing motor overheating and nuisance trips.
  • Comparing site readings with utility limits.

Common mistakes

  • Using phase-to-neutral voltages, which include zero sequence.
  • Comparing a NEMA figure with an IEC limit.
  • Taking one reading during a transient.

Assumptions and limits

  • Fundamental-frequency rms magnitudes.
  • Readings taken at the same moment.

References

  • NEMA MG 1 definition of voltage unbalance
  • IEC 61000-4-30 / IEC 61000-2-12 negative-sequence unbalance

Questions and answers

What unbalance do 415, 410 and 400 V give?

The average is 408.3 V and the largest deviation 8.3 V: 2.0 % by NEMA. The negative-sequence ratio is 2.15 %.

Why does a small voltage unbalance matter for motors?

Negative-sequence voltage drives currents that oppose rotation; current unbalance is several times the voltage unbalance and the windings overheat.

Which definition should I use?

IEC and utility limits use the negative-sequence ratio; motor derating curves in NEMA MG 1 use the deviation from average. Use the one your limit is written in.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.