Worked example
Example: Illustrative 400 kW + 900 kvar step twice a minute. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Short-circuit power at the supply point | 50.000 MVA |
| Source X/R ratio | 5.0000 - |
| Nominal line voltage | 11.000 kV |
| Active power step | 400.00 kW |
| Reactive power step | 900.00 kvar |
| Voltage changes per minute | 2.0000 - |
| Shape factor (1 for rectangular steps) | 1.0000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Relative voltage change | 1.9219 % |
| Flicker impression time per change | 18.608 s |
| Short-term flicker severity | 0.86135 |
Open this example in the calculator and change any input.
Formula
\(d = \frac{\Delta P R + \Delta Q X}{V^2}, \quad t_f = 2.3(Fd)^{3.2}, \quad P_{st} = \left(\frac{\sum t_f}{T_p}\right)^{1/3.2}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(S_{sc}\) | Short-circuit power at the supply point | VA |
| \(X/R\) | Source X/R ratio | - |
| \(V\) | Nominal line voltage | V |
| \(\Delta P\) | Active power step | W |
| \(\Delta Q\) | Reactive power step | var |
| \(r\) | Voltage changes per minute | - |
| \(F\) | Shape factor (1 for rectangular steps) | - |
| \(d\) | Relative voltage change | - |
| \(t_f\) | Flicker impression time per change | s |
| \(P_{st}\) | Short-term flicker severity | - |
Method and standards
Flicker.
Where it is used
- Connecting welders, crushers and large motors.
- Network operator connection studies.
Common mistakes
- Using d as a fraction where the formula needs percent.
- Ignoring the active power term at low X/R.
Assumptions and limits
- Rectangular or equivalent steps; analytical method range.
References
- Analytical flicker evaluation (flicker impression time)
Questions and answers
Why does reactive power dominate?
Supply impedance is mostly reactive, so reactive power steps (motor starts, welders) change voltage most.
What is an acceptable Pst?
Planning levels are usually below 1, often 0.8–0.9 at medium voltage, set by the network operator.
What do the defaults represent?
An illustrative 400 kW + 900 kvar step twice a minute on an 11 kV bus with 50 MVA fault level and X/R 5.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Dugan, McGranaghan, Santoso and Beaty, Electrical Power Systems Quality, 3rd ed. (McGraw-Hill, 2012)