FireCADCalc

Flicker: Voltage Change of a Load Step and Short-Term Severity Pst

Relative voltage change at the supply point from a repeated load step and the short-term flicker severity Pst by the analytical (flicker-time) method.

Thermal power plantProcess steam and utilitiesChemical and fertiliser

Inputs

Examples: Illustrative 400 kW + 900 kvar step twice a minuteWelder on a weak 415 V supplyCrusher motor on 33 kV

Accepted: 0.1 to 10,000 MVA
Accepted: 0.1 to 50
Accepted: 0.1 to 800 kV
Accepted: 0 to 100,000 kW
Accepted: 0 to 100,000 kvar
Accepted: 0.01 to 1,200
Accepted: 0.1 to 1.5

Results

d ≈ (ΔP·R + ΔQ·X)/V²; t_f = 2.3(F·d[%])^3.2 s per change; P_st = (Σt_f/600 s)^(1/3.2) over 10 minutes. P_st = 1 is the conventional threshold of irritability. The analytical method suits regular steps; arc furnaces and welders need a flickermeter or measured data.

Relative voltage change1.2338%
Flicker impression time per change2.2062s
Short-term flicker severity0.28684

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 400 kW + 900 kvar step twice a minute. The inputs, in the units selected above:

InputValue
Short-circuit power at the supply point50.000 MVA
Source X/R ratio5.0000 -
Nominal line voltage11.000 kV
Active power step400.00 kW
Reactive power step900.00 kvar
Voltage changes per minute2.0000 -
Shape factor (1 for rectangular steps)1.0000 -

Applying the formula below gives:

ResultValue
Relative voltage change1.9219 %
Flicker impression time per change18.608 s
Short-term flicker severity0.86135

Open this example in the calculator and change any input.

Formula

\(d = \frac{\Delta P R + \Delta Q X}{V^2}, \quad t_f = 2.3(Fd)^{3.2}, \quad P_{st} = \left(\frac{\sum t_f}{T_p}\right)^{1/3.2}\)

Variables

Symbol Meaning SI unit
\(S_{sc}\) Short-circuit power at the supply point VA
\(X/R\) Source X/R ratio -
\(V\) Nominal line voltage V
\(\Delta P\) Active power step W
\(\Delta Q\) Reactive power step var
\(r\) Voltage changes per minute -
\(F\) Shape factor (1 for rectangular steps) -
\(d\) Relative voltage change -
\(t_f\) Flicker impression time per change s
\(P_{st}\) Short-term flicker severity -

Method and standards

Flicker.

Where it is used

  • Connecting welders, crushers and large motors.
  • Network operator connection studies.

Common mistakes

  • Using d as a fraction where the formula needs percent.
  • Ignoring the active power term at low X/R.

Assumptions and limits

  • Rectangular or equivalent steps; analytical method range.

References

  • Analytical flicker evaluation (flicker impression time)

Questions and answers

Why does reactive power dominate?

Supply impedance is mostly reactive, so reactive power steps (motor starts, welders) change voltage most.

What is an acceptable Pst?

Planning levels are usually below 1, often 0.8–0.9 at medium voltage, set by the network operator.

What do the defaults represent?

An illustrative 400 kW + 900 kvar step twice a minute on an 11 kV bus with 50 MVA fault level and X/R 5.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dugan, McGranaghan, Santoso and Beaty, Electrical Power Systems Quality, 3rd ed. (McGraw-Hill, 2012)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.