Roofing Sheet Quantity with End and Side Laps

Number of profiled roofing sheets for a gable or mono-pitch roof from slope length, roof length, sheet cover width, sheet length and end lap, plus ridge pieces.

Thermal power plantProcess steam and utilitiesSugar mill and cogeneration

Inputs

Examples: Illustrative 30 m gable, 9 m slopesMono-pitch 12 m, single lengthLarge shed 60 m, 15 m slopes

Accepted: 1 to 500 m
Accepted: 1 to 50 m
Accepted: 300 to 1,500 mm
Accepted: 1 to 15 m
Accepted: 50 to 500 mm
Accepted: 0.3 to 5 m
Accepted: 0 to 20 %

Results

Across: W divided by the effective cover width (side lap already deducted by the maker). Up the slope: each extra sheet adds L_sh − e. End laps of 150 mm or more are usual on low slopes; check the maker's minimum slope and fixing pattern. Cutting long single-length sheets to the slope avoids end laps altogether.

Sheets across per slope30.000
Rows up each slope3.0000
Sheets including wastage189.00
Roof area (on slope)540.00m²
Ridge pieces17.000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 30 m gable, 9 m slopes. The inputs, in the units selected above:

InputValue
Roof length along the ridge30.000 m
Slope length (eaves to ridge, with overhang)9.0000 m
Roof slopesGable (two slopes)
Effective cover width per sheet1,000.0 mm
Sheet length3.6600 m
End lap150.00 mm
Ridge piece effective length1.8000 m
Wastage allowance5.0000 %

Applying the formula below gives:

ResultValue
Sheets across per slope30.000
Rows up each slope3.0000
Sheets including wastage189.00
Roof area (on slope)540.00 m²
Ridge pieces17.000

Open this example in the calculator and change any input.

Formula

\(n_a = \left\lceil\frac{W}{c_w}\right\rceil, \quad n_r = \left\lceil\frac{L_s - e}{L_{sh} - e}\right\rceil, \quad N = \lceil n_sn_an_r(1 + f_w)\rceil\)

Variables

Symbol Meaning SI unit
\(W\) Roof length along the ridge m
\(L_s\) Slope length (eaves to ridge, with overhang) m
\(n_s\) Roof slopes -
\(c_w\) Effective cover width per sheet m
\(L_{sh}\) Sheet length m
\(e\) End lap m
\(l_r\) Ridge piece effective length m
\(f_w\) Wastage allowance -
\(n_a\) Sheets across per slope -
\(n_r\) Rows up each slope -
\(N\) Sheets including wastage -
\(A\) Roof area (on slope) m²
\(n_{ridge}\) Ridge pieces -

Method and standards

Sheet layout.

Where it is used

  • Industrial sheds and boiler house roofs.
  • Cladding estimates.

Common mistakes

  • Using the overall sheet width as cover width.
  • Forgetting the eaves overhang in slope length.

Assumptions and limits

  • Rectangular roof planes; no hips or valleys.

References

  • Lapped sheet layout

Questions and answers

What is effective cover width?

The width each sheet covers once the side lap with its neighbour is taken off: for example 1.0 m from a 1.07 m sheet.

Why do rows increase sheets so fast?

Every end lap wastes a strip the length of the lap across the whole roof, so fewer, longer sheets are cheaper and tighter.

What do the defaults represent?

An illustrative 30 m long gable roof with 9 m slopes, 1.0 m cover width, 3.66 m sheets, 150 mm end lap and 5 % wastage.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dutta, Estimating and Costing in Civil Engineering, 28th ed. (UBS, 2020)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.