FireCADCalc

Plaster Quantity: Cement, Sand and Bags

Cement bags and sand for cement plaster from the area, thickness and mix ratio, with the dry volume factor and wastage, by the usual site method.

Inputs

Examples: 100 m², 12 mm, 1:4250 m², 20 mm external, 1:640 m² ceiling, 6 mm, 1:3, factor 1.33, 10 %

Mortar

Allowance for voids and bulking of sand; 1.27 to 1.33 is usual.
Covers uneven surfaces and joints filled; your site figure.

Results

A site estimate: the dry factor and wastage are conventions, so use your own figures where your practice differs.

Wet volume of plaster1.2000m³
Dry volume of materials (with wastage)1.8288m³
Cement volume0.36576m³
Cement mass526.69kg
Cement bags10.534
Sand volume1.4630m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 100 m², 12 mm, 1:4. The inputs, in the units selected above:

InputValue
Area to plaster100.00 m²
Plaster thickness12.000 mm
Sand parts per part of cement4.0000 -
Dry volume factor1.2700 -
Wastage allowance20.000 %
Bulk density of cement1,440.0 kg/m³
Mass of one cement bag50.000 kg

Applying the formula below gives:

ResultValue
Wet volume of plaster1.2000 m³
Dry volume of materials (with wastage)1.8288 m³
Cement volume0.36576 m³
Cement mass526.69 kg
Cement bags10.534
Sand volume1.4630 m³

Open this example in the calculator and change any input.

Formula

\(V_w = A\, t, \quad V_d = V_w\, f_d\, (1 + k_w)\)

\(V_c = \frac{V_d}{1 + s}, \quad N_b = \frac{V_c\, \rho_c}{m_b}, \quad V_s = \frac{s\, V_d}{1 + s}\)

Variables

Symbol Meaning SI unit
\(A\) Area to plaster m²
\(t\) Plaster thickness m
\(s\) Sand parts per part of cement -
\(f_d\) Dry volume factor -
\(k_w\) Wastage allowance -
\(\rho_c\) Bulk density of cement kg/m³
\(m_b\) Mass of one cement bag kg
\(V_w\) Wet volume of plaster m³
\(V_d\) Dry volume of materials (with wastage) m³
\(V_c\) Cement volume m³
\(m_c\) Cement mass kg
\(N_b\) Cement bags -
\(V_s\) Sand volume m³

Method and standards

Dry volume method.

Where it is used

  • Estimating and purchasing.
  • Checking contractor bills.

Common mistakes

  • Forgetting the dry factor.
  • Using mortar ratio by weight.

Assumptions and limits

  • Conventions entered by the user.

References

  • Dry volume method of estimating (site practice)

Questions and answers

How much cement for 100 m² of 12 mm, 1:4 plaster?

Wet volume 1.2 m³, dry with 1.27 factor and 20 % allowance 1.83 m³: 10.5 bags and 1.46 m³ of sand.

What is the dry volume factor?

Mortar shrinks as sand voids fill; 1.27 to 1.33 is usual.

Why add wastage?

Uneven walls take more; 20 % is a common allowance.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.