Concrete Mix Quantities: Cement, Sand and Aggregate

Cement bags, sand, coarse aggregate and water for a volume of concrete from the nominal mix ratio, water–cement ratio and dry volume factor.

Inputs

Examples: 1 m³ of 1:1.5:3, w/c 0.510 m³ of 1:2:4, w/c 0.5525 m³ of 1:1:2, w/c 0.45, factor 1.57

Wet concrete needs more loose dry material than its own volume; 1.52 to 1.57 is the usual site allowance.

Mix ratio by volume

Results

Order 9 whole bags.

A nominal (volume) mix for estimating. Structural concrete grades need a design mix and site trials to the code you work to; add wastage separately.

Dry volume of materials1.5400m³
Cement403.20kg
Cement bags8.0640
Sand0.42000m³
Coarse aggregate0.84000m³
Water201.60kg

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1 m³ of 1:1.5:3, w/c 0.5. The inputs, in the units selected above:

InputValue
Volume of concrete (wet, in place)1.0000 m³
Cement parts in the mix ratio1.0000 -
Sand parts1.5000 -
Coarse aggregate parts3.0000 -
Water–cement ratio by mass0.50000 -
Dry volume factor (voids and bulking)1.5400 -
Bulk density of cement1,440.0 kg/m³
Mass of one cement bag50.000 kg

Applying the formula below gives:

ResultValue
Dry volume of materials1.5400 m³
Cement403.20 kg
Cement bags8.0640
Sand0.42000 m³
Coarse aggregate0.84000 m³
Water201.60 kg

Open this example in the calculator and change any input.

Formula

\(V_d = f_d V\)

\(m_c = V_d \frac{c}{c + s + a} \rho_c, \quad N_b = m_c / m_b\)

\(V_s = V_d \frac{s}{c + s + a}, \quad V_a = V_d \frac{a}{c + s + a}, \quad m_w = (w/c)\, m_c\)

Variables

Symbol Meaning SI unit
\(V\) Volume of concrete (wet, in place) m³
\(c\) Cement parts in the mix ratio -
\(s\) Sand parts -
\(a\) Coarse aggregate parts -
\(w/c\) Water–cement ratio by mass -
\(f_d\) Dry volume factor (voids and bulking) -
\(\rho_c\) Bulk density of cement kg/m³
\(m_b\) Mass of one cement bag kg
\(V_d\) Dry volume of materials m³
\(m_c\) Cement kg
\(N_b\) Cement bags -
\(V_s\) Sand m³
\(V_a\) Coarse aggregate m³
\(m_w\) Water kg

Method and standards

The nominal volume mix: the dry volume of loose materials is shared in the mix ratio; cement is converted to mass with its bulk density and water follows from the water–cement ratio.

Where it is used

  • Site estimates and bills of quantities.
  • Ordering cement and aggregate for foundations and floors.
  • Checking contractors' material claims.

Common mistakes

  • Forgetting the dry volume factor.
  • Using cement particle density instead of bulk density.
  • Adding wastage twice.

Assumptions and limits

  • Nominal volume mix; no admixtures.
  • Wastage not included. The bag count is fractional; a note gives the whole bags to order.

References

  • Nominal (volume) mix method of site estimation

Questions and answers

How many cement bags for 1 m³ of 1:1.5:3 concrete?

With a dry volume factor of 1.54 and cement at 1 440 kg/m³: 403 kg, about 8.1 bags of 50 kg, with 0.42 m³ of sand and 0.84 m³ of aggregate.

Why multiply by 1.54?

The dry loose materials shrink when mixed with water and compacted: voids fill and sand bulking is lost, so more dry volume than the wet volume is needed.

Is a nominal mix good enough?

For estimating and minor work. Structural grades need a design mix with trial batches to the code you work to.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.