Cut and Fill Volumes from a Grid of Levels

Cut and fill volumes over a 3 × 3 grid of ground levels (four squares) to a formation level, with mixed squares split by the four-corner method.

Inputs

Examples: Illustrative 10 m grid sloping siteAll cut 20 m gridMostly fill 5 m grid

Accepted: 1 to 200 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m
Accepted: -1,000 to 9,000 m

Results

Each square: mean of four corner depths × area; squares crossing the formation are split by V_c = a²(Σh₊)²/(4Σ|h|) and V_f = a²(Σh₋)²/(4Σ|h|). Apply bulking and shrinkage factors before balancing cut against fill.

Cut volume134.16m³
Fill volume39.158m³
Net (+ surplus cut)95.000m³
Plan area400.00m²

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 10 m grid sloping site. The inputs, in the units selected above:

InputValue
Grid spacing10.000 m
Formation level100.00 m
Level row 1, col 1101.20 m
Level row 1, col 2100.80 m
Level row 1, col 3100.30 m
Level row 2, col 1100.90 m
Level row 2, col 2100.20 m
Level row 2, col 399.600 m
Level row 3, col 1100.40 m
Level row 3, col 299.700 m
Level row 3, col 399.100 m

Applying the formula below gives:

ResultValue
Cut volume134.16 m³
Fill volume39.158 m³
Net (+ surplus cut)95.000 m³
Plan area400.00 m²

Open this example in the calculator and change any input.

Formula

\(V = \frac{a^2}{4}\sum h \;\text{(all cut or fill)}, \quad V_c = \frac{a^2(\sum h_+)^2}{4\sum|h|}, \quad V_f = \frac{a^2(\sum h_-)^2}{4\sum|h|}\)

Variables

Symbol Meaning SI unit
\(a\) Grid spacing m
\(FL\) Formation level m
\(z_1\) Level row 1, col 1 m
\(z_2\) Level row 1, col 2 m
\(z_3\) Level row 1, col 3 m
\(z_4\) Level row 2, col 1 m
\(z_5\) Level row 2, col 2 m
\(z_6\) Level row 2, col 3 m
\(z_7\) Level row 3, col 1 m
\(z_8\) Level row 3, col 2 m
\(z_9\) Level row 3, col 3 m
\(V_c\) Cut volume m³
\(V_f\) Fill volume m³
\(V_c - V_f\) Net (+ surplus cut) m³
\(A\) Plan area m²

Method and standards

Grid method.

Where it is used

  • Site levelling and platform design.
  • Borrow pit measurement.

Common mistakes

  • Averaging cut and fill corners together.
  • Forgetting bulking and compaction factors.

Assumptions and limits

  • Square grid; planar faces within each square.

References

  • Grid (borrow-pit) method with four-corner mixed squares
  • Uren and Price
  • Surveying for Engineers (Palgrave)

Questions and answers

Why split mixed squares?

Averaging corners of a square that crosses the formation would cancel cut against fill and understate both.

What grid spacing should I use?

10–20 m on gentle ground; closer where the ground changes sharply.

What do the defaults represent?

An illustrative 20 × 20 m area on a 10 m grid sloping from 101.2 to 99.1 m, levelled to 100.0 m.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.