Worked example
Example: Illustrative 10 m grid sloping site. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Grid spacing | 10.000 m |
| Formation level | 100.00 m |
| Level row 1, col 1 | 101.20 m |
| Level row 1, col 2 | 100.80 m |
| Level row 1, col 3 | 100.30 m |
| Level row 2, col 1 | 100.90 m |
| Level row 2, col 2 | 100.20 m |
| Level row 2, col 3 | 99.600 m |
| Level row 3, col 1 | 100.40 m |
| Level row 3, col 2 | 99.700 m |
| Level row 3, col 3 | 99.100 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Cut volume | 134.16 m³ |
| Fill volume | 39.158 m³ |
| Net (+ surplus cut) | 95.000 m³ |
| Plan area | 400.00 m² |
Open this example in the calculator and change any input.
Formula
\(V = \frac{a^2}{4}\sum h \;\text{(all cut or fill)}, \quad V_c = \frac{a^2(\sum h_+)^2}{4\sum|h|}, \quad V_f = \frac{a^2(\sum h_-)^2}{4\sum|h|}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(a\) | Grid spacing | m |
| \(FL\) | Formation level | m |
| \(z_1\) | Level row 1, col 1 | m |
| \(z_2\) | Level row 1, col 2 | m |
| \(z_3\) | Level row 1, col 3 | m |
| \(z_4\) | Level row 2, col 1 | m |
| \(z_5\) | Level row 2, col 2 | m |
| \(z_6\) | Level row 2, col 3 | m |
| \(z_7\) | Level row 3, col 1 | m |
| \(z_8\) | Level row 3, col 2 | m |
| \(z_9\) | Level row 3, col 3 | m |
| \(V_c\) | Cut volume | m³ |
| \(V_f\) | Fill volume | m³ |
| \(V_c - V_f\) | Net (+ surplus cut) | m³ |
| \(A\) | Plan area | m² |
Method and standards
Grid method.
Where it is used
- Site levelling and platform design.
- Borrow pit measurement.
Common mistakes
- Averaging cut and fill corners together.
- Forgetting bulking and compaction factors.
Assumptions and limits
- Square grid; planar faces within each square.
References
- Grid (borrow-pit) method with four-corner mixed squares
- Uren and Price
- Surveying for Engineers (Palgrave)
Questions and answers
Why split mixed squares?
Averaging corners of a square that crosses the formation would cancel cut against fill and understate both.
What grid spacing should I use?
10–20 m on gentle ground; closer where the ground changes sharply.
What do the defaults represent?
An illustrative 20 × 20 m area on a 10 m grid sloping from 101.2 to 99.1 m, levelled to 100.0 m.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.