Worked example
Example: 200 mm damp, 165 mm flooded. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Height of damp sand in the container | 200.00 mm |
| Height after flooding with water (inundated) | 165.00 mm |
| Sand volume required by the mix (dry, loose) | 0.50000 m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Bulking (h₁ − h₂)/h₂ | 21.212 % |
| Damp sand volume to batch V(1 + β) | 0.60606 m³ |
Open this example in the calculator and change any input.
Formula
\(\beta = \frac{h_1 - h_2}{h_2}, \quad V_b = V(1 + \beta)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(h_1\) | Height of damp sand in the container | m |
| \(h_2\) | Height after flooding with water (inundated) | m |
| \(V\) | Sand volume required by the mix (dry, loose) | m³ |
| \(\beta\) | Bulking (h₁ − h₂)/h₂ | - |
| \(V_b\) | Damp sand volume to batch V(1 + β) | m³ |
Method and standards
Volume ratio of damp to inundated sand.
Where it is used
- Volume batching of mortar and concrete.
- Site quality checks.
Common mistakes
- Using the damp height as base.
- Ignoring bulking in plaster mixes.
Assumptions and limits
- Field test.
- The inundated volume stands in for the dry loose volume of the mix design (flooded sand occupies about the same volume as dry sand), so V is the dry, loose volume and the damp volume to batch is V(1 + β).
References
- Field method for bulking of sand (IS 2386 Part 3 principle)
Questions and answers
200 mm damp, 165 mm inundated?
Bulking 21.2 %: batch 0.606 m³ of damp sand for 0.5 m³ dry.
Why does damp sand bulk?
Water films push the grains apart; flooded sand settles back.
Does batching by weight avoid it?
Yes, then correct for moisture instead.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.