FireCADCalc

Power for Sale from a Sugar Factory (Hugot)

Power per tonne cane from drive turbines, pass-out, back-pressure and condensing turbo-alternator steam, own use and export (Hugot pp. 1018–1022).

Sugar mill and cogenerationSteam turbine

Inputs

Examples: Hugot example: 250 TCHLess condensing

Include the power of the turbine-driven mills and pumps, because their drive-turbine power is counted in the total.

Results

Hugot's example (250 t/h, 708 kg/t at 55 atm 440 °C): 4.7 + 3.6 + 35.4 + 64.6 = 108 kW per t/h, 27 MW generated, about 17.8 MW for sale.

Steam condensed per tonne cane170.00kg/t
Power from drive turbines per t cane/h0kWh/t
Power from the pass-out steam2.7273kWh/t
Power from the back-pressure steam44.444kWh/t
Power from the condensing steam34.000kWh/t
Total per t cane/h81.172kWh/t
Total generated (alternators plus drive turbines)16,234kW
Power for sale9,834.3kW

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Hugot example: 250 TCH. The inputs, in the units selected above:

InputValue
Crushing rate250.00 t/h
Steam available per tonne cane708.00 kg/t
Steam to drive turbines per tonne cane26.000 kg/t
Their steam rate5.5000 kg/kWh
Pass-out (medium pressure) steam per tonne cane40.000 kg/t
Steam rate to the pass-out11.000 kg/kWh
Back-pressure (process) steam per tonne cane319.00 kg/t
Steam rate to back pressure9.0000 kg/kWh
Steam rate of the condensing part5.0000 kg/kWh
Own power use per t cane/h37.000 kWh/t

Applying the formula below gives:

ResultValue
Steam condensed per tonne cane323.00 kg/t
Power from drive turbines per t cane/h4.7273 kWh/t
Power from the pass-out steam3.6364 kWh/t
Power from the back-pressure steam35.444 kWh/t
Power from the condensing steam64.600 kWh/t
Total per t cane/h108.41 kWh/t
Total generated (alternators plus drive turbines)27,102 kW
Power for sale17,852 kW

Open this example in the calculator and change any input.

Formula

\(S_c = S - S_d - S_m - S_p, \quad p = \frac{S_d}{r_d} + \frac{S_m}{r_m} + \frac{S_p}{r_p} + \frac{S_c}{r_c}, \quad P_x = (p - P_o)A\)

Variables

Symbol Meaning SI unit
\(A\) Crushing rate kg/s
\(S\) Steam available per tonne cane kg/kg
\(S_d\) Steam to drive turbines per tonne cane kg/kg
\(r_d\) Their steam rate kg/J
\(S_m\) Pass-out (medium pressure) steam per tonne cane kg/kg
\(r_m\) Steam rate to the pass-out kg/J
\(S_p\) Back-pressure (process) steam per tonne cane kg/kg
\(r_p\) Steam rate to back pressure kg/J
\(r_c\) Steam rate of the condensing part kg/J
\(P_o\) Own power use per t cane/h J/kg
\(S_c\) Steam condensed per tonne cane kg/kg
\(p_d\) Power from drive turbines per t cane/h J/kg
\(p_m\) Power from the pass-out steam J/kg
\(p_p\) Power from the back-pressure steam J/kg
\(p_c\) Power from the condensing steam J/kg
\(p\) Total per t cane/h J/kg
\(P_g\) Total generated (alternators plus drive turbines) W
\(P_x\) Power for sale W

Method and standards

Hugot's power balance by steam path.

Where it is used

  • Cogeneration studies.
  • Power purchase negotiations.

Common mistakes

  • Counting drive-turbine power as exportable.
  • Steam rates at full load used for part load.

Assumptions and limits

  • All steam available is used.
  • The total includes the mechanical power of the drive turbines, so the own use must include the mills and pumps they drive; otherwise the power for sale is overstated.
  • A negative power for sale means the factory imports; a note says so.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 41
  • steam balance for maximum economy and power for sale
  • pp. 1016–1022

Questions and answers

Why does process steam give so much power?

Steam expanding to the process pressure yields power on the way at a steam rate near 9 kg/kWh; condensing it yields about 5.

Why does steam economy matter?

Each kilogram of process steam saved can be condensed instead, giving more power for sale.

Typical export?

Hugot reports 70–80 kW per t cane/h possible with high-pressure boilers and an economical factory.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.