Volume flow of whole, knifed and shredded cane from their bulk densities, and the bed depth of prepared cane on a carrier, with bulk densities from Hugot.

Sugar mill and cogeneration

Inputs

Examples: 250 TCHKerr shredded density

Hugot: tangled whole cane 125–150 kg/m³.
Hugot: 250–300 kg/m³.
Hugot reports 400 (Kerr), 250–275 (Réunion) and 200–250 (Mauritius) kg/m³.

Results

Volume flow, whole cane1,666.7m³/h
Volume flow after the knives909.09m³/h
Volume flow after the shredder833.33m³/h
Overall compaction2.0000
Bed depth of shredded cane462.96mm

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 250 TCH. The inputs, in the units selected above:

InputValue
Crushing rate250.00 t/h
Bulk density, whole cane150.00 kg/m³
Bulk density after the knives275.00 kg/m³
Bulk density after the shredder300.00 kg/m³
Speed of the carrier after the shredder15.000 m/min
Carrier width2.0000 m

Applying the formula below gives:

ResultValue
Volume flow, whole cane1,666.7 m³/h
Volume flow after the knives909.09 m³/h
Volume flow after the shredder833.33 m³/h
Overall compaction2.0000
Bed depth of shredded cane462.96 mm

Open this example in the calculator and change any input.

Formula

\(\dot V_i = \frac{A}{d_i}, \quad h_2 = \frac{A}{d_2\,u\,L}\)

Variables

Symbol Meaning SI unit
\(A\) Crushing rate kg/s
\(d_0\) Bulk density, whole cane kg/m³
\(d_1\) Bulk density after the knives kg/m³
\(d_2\) Bulk density after the shredder kg/m³
\(u\) Speed of the carrier after the shredder m/s
\(L\) Carrier width m
\(\dot V_0\) Volume flow, whole cane m³/s
\(\dot V_1\) Volume flow after the knives m³/s
\(\dot V_2\) Volume flow after the shredder m³/s
\(d_2/d_0\) Overall compaction -
\(h_2\) Bed depth of shredded cane m

Method and standards

Continuity with measured bulk densities.

Where it is used

  • Sizing carriers and chutes after preparation.
  • Checking the effect of a shredder on carrier loading.

Common mistakes

  • Using whole-cane density for prepared cane.
  • Mixing m/min and m/s.

Assumptions and limits

  • Densities from local measurement where possible. A density that falls from one stage to the next, or lies outside Hugot's 125–400 kg/m³, is flagged.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 3 (p. 32) and ch. 6 (p. 70)
  • bulk densities of whole
  • knifed and shredded cane

Questions and answers

Why does the volume fall after the knives?

Cutting lets the pieces pack; bulk density roughly doubles from tangled whole cane.

Why do shredded densities differ so much?

They depend on fineness, fibre and how the sample is taken; Hugot reports 200 to 400 kg/m³.

What sets the bed depth?

Mass rate over density, width and speed: a faster carrier gives a thinner bed.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.