Cane Yard Overnight Stock (Hugot)

Cane the yard must hold so the mill keeps crushing through the night when cane arrives only in daylight, with a reserve of a few hours (Hugot eqns 1.1–1.3).

Sugar mill and cogeneration

Inputs

Examples: Hugot: 12 h transport, 3 h reserve16 h transport, 2 h reserve

Results

The yard holds 8.0 hours of crushing at the end of deliveries; cut cane loses sucrose while it waits, so keep it no larger than the transport needs.

Cane to hold in the yard at the end of deliveries3,200.0t
Stock in hours of crushing8.0000h
Delivery rate needed while cane arrives550.00t/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Hugot: 12 h transport, 3 h reserve. The inputs, in the units selected above:

InputValue
Crushing rate250.00 t/h
Crushing hours per day24.000 h
Hours per day in which cane is delivered12.000 h
Reserve kept in the yard (hours of crushing)3.0000 h

Applying the formula below gives:

ResultValue
Cane to hold in the yard at the end of deliveries3,750.0 t
Stock in hours of crushing15.000 h
Delivery rate needed while cane arrives500.00 t/h

Open this example in the calculator and change any input.

Formula

\(P = A\,(t_c - t_d) + A\,t_r \quad\text{(Hugot: } P = 12A + 3A = 15A)\)

\(\dot m_d = \frac{A\,t_c}{t_d}\)

Variables

Symbol Meaning SI unit
\(A\) Crushing rate kg/s
\(t_c\) Crushing hours per day s
\(t_d\) Hours per day in which cane is delivered s
\(t_r\) Reserve kept in the yard (hours of crushing) s
\(P\) Cane to hold in the yard at the end of deliveries kg
\(P/A\) Stock in hours of crushing s
\(\dot m_d\) Delivery rate needed while cane arrives kg/s

Method and standards

Hugot's cane-yard balance: the cane delivered during transport hours must carry the crush through the hours without deliveries plus a reserve.

Where it is used

  • Planning cane yards and night stock for a new crush rate.
  • Checking whether the transport hours suit the crush.

Common mistakes

  • Counting the reserve twice when transport also runs at night.
  • Forgetting that the delivery rate must exceed the crush rate when deliveries stop at night.

Assumptions and limits

  • Steady crush; delivery evenly spread over the delivery hours, and all delivery hours fall within crushing hours. If the mill stops while cane still arrives, the stock needed differs.
  • Hugot's case: 12 hours of daylight transport, 24 hours of crushing and 3 hours of reserve give P = 15 A.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 1
  • eqns 1.1–1.3
  • p. 1

Questions and answers

Why hold cane overnight?

Cane usually arrives by day but the mill crushes round the clock; the yard bridges the hours without deliveries.

How big a reserve?

Hugot takes three hours of crushing, enough to ride through a short break in transport.

Is a large stock good?

No. Cut cane loses sucrose and weight while it waits; keep the stock as small as the transport allows.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.