Worked example
Example: 2 t at 15 m/min, 10 m, 80 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Mass lifted (load plus hook and cage) | 2,000.0 kg |
| Lifting speed | 15.000 m/min |
| Height of the lift | 10.000 m |
| Efficiency of the gearing, ropes and drum | 80.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Power at the load m g v | 4.9033 kW |
| Motor power P_l/η | 6.1292 kW |
| Potential energy gained m g H | 196.13 kJ |
| Time for the lift | 40.000 s |
Open this example in the calculator and change any input.
Formula
\(P_l = m g v, \quad P_m = \frac{P_l}{\eta}, \quad E_p = m g H\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(m\) | Mass lifted (load plus hook and cage) | kg |
| \(v\) | Lifting speed | m/s |
| \(H\) | Height of the lift | m |
| \(\eta\) | Efficiency of the gearing, ropes and drum | - |
| \(P_l\) | Power at the load m g v | W |
| \(P_m\) | Motor power P_l/η | W |
| \(E_p\) | Potential energy gained m g H | J |
| \(t\) | Time for the lift | s |
Method and standards
Work and power.
Where it is used
- Hoists, lifts and winches.
- Mechanics examinations.
Common mistakes
- Forgetting the hook and rope mass.
- Ignoring efficiency.
Assumptions and limits
- Constant speed. The motor power has no allowance for acceleration torque, motor efficiency or a duty/service factor: add them for motor selection.
References
- Textbook mechanics (power = force × velocity)
Questions and answers
2 t at 15 m/min through 80 % efficiency?
4.9 kW at the load, 6.1 kW at the motor.
How long for 10 m?
40 s.
What about acceleration?
Add m a v for the starting period; motors have a short-time overload rating.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.