Worked example
Example: 60 L/min VG32 in 19 mm pressure line. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Flow | 60.000 L/min |
| Line type | Pressure line (4.5 m/s) |
| Chosen inside diameter | 19.000 mm |
| Line length (equivalent) | 10.000 m |
| Oil kinematic viscosity | 32.000 cSt |
| Oil density | 870.00 kg/m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Minimum diameter for the velocity | 16.821 mm |
| Velocity in the chosen line | 3.5270 m/s |
| Reynolds number | 2,094.1 |
| Pressure drop | 0.87039 bar |
Open this example in the calculator and change any input.
Formula
\(d_{min} = \sqrt{\frac{4Q}{\pi v_{max}}}, \quad \Delta p = f_D\frac{L}{d}\frac{\rho v^2}{2}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q\) | Flow | m³/s |
| \(\text{line}\) | Line type | - |
| \(d\) | Chosen inside diameter | m |
| \(L\) | Line length (equivalent) | m |
| \(\nu\) | Oil kinematic viscosity | m²/s |
| \(\rho\) | Oil density | kg/m³ |
| \(d_{min}\) | Minimum diameter for the velocity | m |
| \(v\) | Velocity in the chosen line | m/s |
| \(Re\) | Reynolds number | - |
| \(\Delta p\) | Pressure drop | Pa |
Method and standards
Pipe friction.
Where it is used
- Hydraulic power unit layout.
- Checking hose sizes.
Common mistakes
- Using nominal hose size as inside diameter.
- Warm-oil viscosity for cold starts.
Assumptions and limits
- Drawn tube, roughness 1.5 µm; isothermal; laminar f = 64/Re below Re 2 300.
- A velocity above the line type's figure is flagged.
References
- Darcy–Weisbach with laminar and Colebrook friction (FireCAD engine); recommended velocities from fluid power practice
Questions and answers
Why lower velocity in suction lines?
To keep the pump inlet above vapour pressure and avoid cavitation.
Is hydraulic flow usually laminar?
In small lines with warm oil, often yes; below Re 2,300 the calculator uses f = 64/Re.
What do the defaults represent?
60 L/min of ISO VG 32 oil in a 19 mm pressure line, 10 m long.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.