Worked example
Example: Single-V 120 mm² in 12 mm, 2 mm gap. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Weld cross-sectional area | 120.00 mm² |
| Plate thickness | 12.000 mm |
| Root opening | 2.0000 mm |
| Number of similar welds in line | 1.0000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Shrinkage per weld | 2.1000 mm |
| Total shrinkage | 2.1000 mm |
Open this example in the calculator and change any input.
Formula
\(S = 0.2\frac{A_w}{t} + 0.05d\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A_w\) | Weld cross-sectional area | m² |
| \(t\) | Plate thickness | m |
| \(d\) | Root opening | m |
| \(n\) | Number of similar welds in line | - |
| \(S\) | Shrinkage per weld | m |
| \(S_{tot}\) | Total shrinkage | m |
Method and standards
Blodgett's empirical relation.
Where it is used
- Allowing for shrinkage in fabrication drawings.
- Comparing joint designs.
Common mistakes
- Over-welding (adds area and shrinkage).
- Ignoring cumulative shrinkage of several welds.
Assumptions and limits
- Steel butt welds.
References
- Transverse shrinkage S = 0.2A_w/t + 0.05d (Blodgett, Design of Welded Structures, James F. Lincoln Arc Welding Foundation, 1966, sec. 7.7)
Questions and answers
Why does a weld shrink?
Hot weld metal and the adjacent plate contract on cooling; the cold plate around resists, leaving shrinkage and residual stress.
How do I reduce shrinkage?
Smaller weld area (narrower bevels, less over-weld), fewer passes, balanced welding.
What do the defaults represent?
A single-V butt weld of about 120 mm² in 12 mm plate with a 2 mm root gap.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.