Worked example
Example: 250 t ladle, 120 t/min. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Steel in the ladle | 250.00 t |
| Metal circulation rate | 7,200.0 t/h |
| Steel in the RH vessel | 15.000 t |
| Decarburisation rate constant in the vessel | 15.000 1/min |
| Initial carbon | 350.00 ppm |
| Equilibrium carbon | 5.0000 ppm |
| Target carbon | 20.000 ppm |
Applying the formula below gives:
| Result | Value |
|---|---|
| Overall rate constant | 0.31304 1/min |
| Circulation limit Q/W | 0.48000 1/min |
| Time to the target carbon | 10.016 min |
| Carbon after 10 min | 20.076 ppm |
Open this example in the calculator and change any input.
Formula
\(\ln\frac{[\%C] - [\%C]_e}{[\%C]_0 - [\%C]_e} = -Kt, \quad K = \frac{Q}{W}\left(\frac{kW_{RH}}{kW_{RH} + Q}\right)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(W\) | Steel in the ladle | kg |
| \(Q\) | Metal circulation rate | kg/s |
| \(W_{RH}\) | Steel in the RH vessel | kg |
| \(k\) | Decarburisation rate constant in the vessel | 1/s |
| \([\%C]_0\) | Initial carbon | - |
| \([\%C]_e\) | Equilibrium carbon | - |
| \([\%C]^*\) | Target carbon | - |
| \(K\) | Overall rate constant | 1/s |
| \(Q/W\) | Circulation limit Q/W | 1/s |
| \(t\) | Time to the target carbon | s |
| \([\%C]_{10}\) | Carbon after 10 min | - |
Method and standards
Two-zone RH decarburisation model.
Where it is used
- Planning ultra-low-carbon treatment times.
- Assessing snorkel and lift-gas upgrades.
Common mistakes
- Using the circulation rate in t/h with k in 1/min.
- Ignoring the equilibrium carbon at the vessel pressure.
Assumptions and limits
- Approximate solution; constant rate constant.
Questions and answers
What limits the rate?
Two resistances in series: the circulation that brings ladle steel to the vessel (Q/W) and the reaction in the vessel (k W_RH/W); K combines them.
How do I raise the rate?
Increase the circulation (lift gas, snorkel diameter), the steel held in the vessel or the reaction constant (lower pressure, more surface from argon).
What do the defaults represent?
250 t ladle, 120 t/min circulation, 15 t in the vessel and k = 15 min⁻¹: K = 0.31 min⁻¹ (Q/W 0.48), and 350 ppm C falls to 20 ppm in 10.0 min with 5 ppm at equilibrium.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Fruehan (ed.), The Making, Shaping and Treating of Steel, 11th ed., Steelmaking and Refining Volume (AISE Steel Foundation, 1998), sec. 2.11.2, eqs. 2.11.5-2.11.8