Worked example
Example: Illustrative ten tubes at 950 C. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Tube outside diameter | 150.00 mm |
| Heated tube length | 2.0000 m |
| Number of tubes | 10.000 - |
| Tube surface temperature | 950.00 °C |
| Load surface temperature | 800.00 °C |
| Tube emissivity | 85.000 % |
| Load emissivity | 80.000 % |
| Tube area over load area | 0.40000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Tube surface area | 9.4248 m² |
| Exchange factor | 0.78341 |
| Heat to the load | 381.83 kW |
| Flux on the tube | 40.513 kW/m² |
Open this example in the calculator and change any input.
Formula
\(Q = \sigma A_t F\left(T_t^4 - T_l^4\right), \quad F = \frac{1}{1/\varepsilon_t + (A_t/A_l)(1/\varepsilon_l - 1)}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(d\) | Tube outside diameter | m |
| \(L\) | Heated tube length | m |
| \(n\) | Number of tubes | - |
| \(T_t\) | Tube surface temperature | K |
| \(T_l\) | Load surface temperature | K |
| \(\varepsilon_t\) | Tube emissivity | - |
| \(\varepsilon_l\) | Load emissivity | - |
| \(A_t/A_l\) | Tube area over load area | - |
| \(A_t\) | Tube surface area | m² |
| \(F\) | Exchange factor | - |
| \(Q\) | Heat to the load | W |
| \(q\) | Flux on the tube | W/m² |
Method and standards
Radiant tubes.
Where it is used
- Heat treatment and annealing furnaces.
- Converting direct-fired to indirect heating.
Common mistakes
- Using gas temperature for tube temperature.
- Ignoring tube life limits.
Assumptions and limits
- Gray surfaces; reradiating walls.
References
- Two-surface gray enclosure radiation
Questions and answers
How much heat do ten 150 mm × 2 m tubes at 950 °C give to a load at 800 °C?
About 380 kW, near 40 kW/m² of tube surface.
Why does the output fall as the load heats?
Radiation depends on the difference of fourth powers of temperature.
What do the defaults represent?
Ten 150 mm tubes, 2 m heated length, at 950 °C, radiating to a load at 800 °C, emissivities 0.85 and 0.8, area ratio 0.4.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.