Worked example
Example: Five 2 m anodes, 30 Ω·m, 20 A. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Protection current | 20.000 A |
| Soil resistivity | 3.0000e+07 Ω·mm²/m |
| Anode (backfill column) length | 2.0000 m |
| Anode (backfill column) diameter | 250.00 mm |
| Number of anodes in line | 5.0000 - |
| Anode spacing | 5.0000 m |
| Cable and structure-to-earth resistance | 0.30000 Ω |
| Back e.m.f. | 2.0000 V |
| Design margin on current and voltage | 25.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Single anode resistance | 7.5413 Ω |
| Groundbed resistance | 1.9620 Ω |
| Required voltage | 47.240 V |
| Rectifier voltage rating | 59.049 V |
| Rectifier current rating | 25.000 A |
| Rectifier d.c. output | 1.4762 kW |
Open this example in the calculator and change any input.
Formula
\(R_1 = \frac{\rho}{2\pi L}\left(\ln\frac{8L}{d} - 1\right), \quad R_n = \frac{\rho}{2\pi nL}\left(\ln\frac{8L}{d} - 1 + \frac{2L}{S}\ln(0.656n)\right), \quad V = I(R_n + R_c) + E_b\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(I\) | Protection current | A |
| \(\rho\) | Soil resistivity | Ω·m |
| \(L\) | Anode (backfill column) length | m |
| \(d\) | Anode (backfill column) diameter | m |
| \(n\) | Number of anodes in line | - |
| \(S\) | Anode spacing | m |
| \(R_c\) | Cable and structure-to-earth resistance | Ω |
| \(E_b\) | Back e.m.f. | V |
| \(f_m\) | Design margin on current and voltage | - |
| \(R_1\) | Single anode resistance | Ω |
| \(R_n\) | Groundbed resistance | Ω |
| \(V\) | Required voltage | V |
| \(V_r\) | Rectifier voltage rating | V |
| \(I_r\) | Rectifier current rating | A |
| \(P\) | Rectifier d.c. output | W |
Method and standards
Dwight and Sunde.
Where it is used
- Pipeline and tank-bottom ICCP design.
- Plant buried piping protection.
Common mistakes
- Using anode size instead of backfill column.
- Close spacing (mutual interference).
Assumptions and limits
- Uniform soil; vertical anodes in line.
- Dwight's formula assumes a slender anode: anodes too short for the formula to give a positive resistance are rejected, and a note appears below about ten diameters of length.
References
- Dwight (1936) single vertical anode and Sunde (1968) multiple anodes in line (Peabody, Control of Pipeline Corrosion, 2nd ed., NACE, ch. 9)
Questions and answers
Why is soil resistivity so important?
Groundbed resistance is proportional to it; high-resistivity sites need more or longer anodes, or deep wells.
What is back e.m.f.?
The galvanic potential between anode and structure that the rectifier must overcome, about 2 V for typical anodes.
What do the defaults represent?
Five 2 m anode columns in 30 Ω·m soil supplying 20 A.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.