Worked example
Example: Coated buried pipe. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Surface area to protect | 2,500.0 m² |
| Coating breakdown factor (bare share) | 5.0000 % |
| Design current density on bare steel | 0.020000 A/m² |
| Design margin | 25.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Current without margin | 2.5000 A |
| Design current | 3.1250 A |
Open this example in the calculator and change any input.
Formula
\(I = A f_c i_c (1 + k)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Surface area to protect | m² |
| \(f_c\) | Coating breakdown factor (bare share) | - |
| \(i_c\) | Design current density on bare steel | A/m² |
| \(k\) | Design margin | - |
| \(I_b\) | Current without margin | A |
| \(I\) | Design current | A |
Method and standards
Current balance.
Where it is used
- Buried cooling water pipes and tanks.
- Jetty and intake structures.
Common mistakes
- Initial breakdown used for the whole life.
- Ignoring other structures sharing the system.
Assumptions and limits
- Uniform current density.
References
- I = A × f_c × i_c (cathodic protection design practice)
Questions and answers
2500 m² with 5 % bare at 20 mA/m²?
2.5 A; 3.1 A with a 25 % margin.
Why does coating matter so much?
Only bare steel draws current; a good coating cuts it twentyfold.
End of life?
Coating breakdown grows with age; design for the final value.