Flowmeter Turndown and Accuracy over the Range

Turndown of a flowmeter from its maximum and minimum flows, and the error at a flow when accuracy is given as % of reading above a cut-off and % of span below.

Thermal power plantProcess steam and utilities

Inputs

Examples: 100 max, 5 min; at 10 with 0.5 % reading / 0.1 % FSSame meter at 80DP meter 0–200, 1 % FS only, at 40

Results

The larger of the two statements applies at each flow, the usual form of maker's accuracy statements.

Turndown Q_max / Q_min20.000
Error at the flow (±)0.40000
Error as a share of the flow0.50000%
Change-over flow where both statements agree20.000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 100 max, 5 min; at 10 with 0.5 % reading / 0.1 % FS. The inputs, in the units selected above:

InputValue
Maximum flow of the meter100.00 -
Minimum flow of interest5.0000 -
Flow to check10.000 -
Accuracy as a share of reading0.50000 %
Accuracy as a share of full scale (below the change-over)0.10000 %

Applying the formula below gives:

ResultValue
Turndown Q_max / Q_min20.000
Error at the flow (±)0.10000
Error as a share of the flow1.0000 %
Change-over flow where both statements agree20.000

Open this example in the calculator and change any input.

Formula

\(TD = \frac{Q_{max}}{Q_{min}}, \quad e = \max(a_r Q,\ a_f Q_{max})\)

Variables

Symbol Meaning SI unit
\(Q_{max}\) Maximum flow of the meter -
\(Q_{min}\) Minimum flow of interest -
\(Q\) Flow to check -
\(a_r\) Accuracy as a share of reading -
\(a_f\) Accuracy as a share of full scale (below the change-over) -
\(TD\) Turndown Q_max / Q_min -
\(e\) Error at the flow (±) -
\(e/Q\) Error as a share of the flow -
\(Q_x\) Change-over flow where both statements agree -

Method and standards

Definitions.

Where it is used

  • Meter selection.
  • Low-flow accuracy checks.

Common mistakes

  • Quoting % of reading below the change-over.
  • Ignoring zero stability.

Assumptions and limits

  • Two-part accuracy statement; with no %-of-reading part the change-over flow is not shown.

References

  • Definition of turndown; maker-style accuracy statements

Questions and answers

100 maximum, 5 minimum: what turndown?

20:1.

Error at 10 with ±0.5 % of reading and ±0.1 % of full scale below 20?

±0.1, which is ±1 % of the flow.

Why do DP meters have little turndown?

Flow goes as √DP, so 10:1 in flow is 100:1 in DP.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.