FireCADCalc

Inflation: Future Cost and Real Interest Rate (Fisher)

Future price of a present cost at an inflation rate, and the real interest rate from a nominal rate and inflation by the Fisher relation.

Inputs

Examples: 5 % inflation, 8 yearsHigh inflation

Results

Future cost1,762,342
Real interest rate2.6786%
Purchasing power of 1 after n years56.743%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 5 % inflation, 8 years. The inputs, in the units selected above:

InputValue
Present cost5,000,000 -
Inflation rate5.0000 %
Years8.0000 -
Nominal interest rate10.000 %

Applying the formula below gives:

ResultValue
Future cost7,387,277
Real interest rate4.7619 %
Purchasing power of 1 after n years67.684 %

Open this example in the calculator and change any input.

Formula

\(C_n = C(1 + f)^n, \quad i_r = \frac{1 + i}{1 + f} - 1\)

Variables

Symbol Meaning SI unit
\(C\) Present cost -
\(f\) Inflation rate -
\(n\) Years -
\(i\) Nominal interest rate -
\(C_n\) Future cost -
\(i_r\) Real interest rate -
\(PP\) Purchasing power of 1 after n years -

Method and standards

Fisher relation.

Where it is used

  • Budgeting future projects.
  • Choosing discount rates.

Common mistakes

  • Subtracting rates instead of dividing.
  • Mixing real and nominal.

Assumptions and limits

  • Constant rates.

References

  • Future cost C(1 + f)ⁿ; Fisher (1 + i) = (1 + i_r)(1 + f)

Questions and answers

50 lakh today at 5 % inflation in 8 years?

About 7,387,277.

Real rate at 10 % nominal and 5 % inflation?

4.76 %, not exactly 5 %.

Which rate for NPV?

Real rate with today's prices, or nominal rate with inflated prices: never mix.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.