Break-Even Point and Margin of Safety

Break-even volume and revenue from fixed costs, selling price and variable cost per unit, with contribution margin, profit at a planned volume and margin of safety.

Inputs

Examples: 2 M fixed, 500 price, 300 variable, 15 000 units750 000 fixed, 1 200 price, 700 variable, 1 000 units50 000 fixed, 25 price, 10 variable, 2 000 units (loss)

Results

Break-even volume (units)3,333.3
Break-even revenue83,333
Contribution margin ratio (p − v)/p60.000%
Profit at the planned volume-20,000
Margin of safety (share of planned volume above break-even)-66.667%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 2 M fixed, 500 price, 300 variable, 15 000 units. The inputs, in the units selected above:

InputValue
Fixed costs per period2,000,000 -
Selling price per unit500.00 -
Variable cost per unit300.00 -
Planned volume (units per period)15,000 -

Applying the formula below gives:

ResultValue
Break-even volume (units)10,000
Break-even revenue5,000,000
Contribution margin ratio (p − v)/p40.000 %
Profit at the planned volume1,000,000
Margin of safety (share of planned volume above break-even)33.333 %

Open this example in the calculator and change any input.

Formula

\(Q_{BE} = \frac{F}{p - v}, \quad R_{BE} = p\, Q_{BE}, \quad CM = \frac{p - v}{p}\)

\(\Pi = Q (p - v) - F, \quad MOS = \frac{Q - Q_{BE}}{Q}\)

Variables

Symbol Meaning SI unit
\(F\) Fixed costs per period -
\(p\) Selling price per unit -
\(v\) Variable cost per unit -
\(Q\) Planned volume (units per period) -
\(Q_{BE}\) Break-even volume (units) -
\(R_{BE}\) Break-even revenue -
\(CM\) Contribution margin ratio (p − v)/p -
\(\Pi\) Profit at the planned volume -
\(MOS\) Margin of safety (share of planned volume above break-even) -

Method and standards

Cost–volume–profit analysis with linear costs: each unit sold contributes price less variable cost towards the fixed costs.

Where it is used

  • Deciding whether a new product line or service pays.
  • Steam or power sales pricing.
  • Testing the effect of a price change.

Common mistakes

  • Treating semi-variable costs as fixed.
  • Using list price instead of net realised price.
  • Ignoring capacity limits above break-even.

Assumptions and limits

  • Linear costs and prices over the range.
  • The margin of safety is not shown when the planned volume is zero.

References

  • Cost–volume–profit analysis (management accounting)

Questions and answers

Where does a product with 2 M fixed costs, price 500 and variable cost 300 break even?

At 10 000 units, 5 M of revenue; each unit contributes 200, a 40 % margin.

What does 15 000 units earn?

1 M profit, with a 33 % margin of safety above break-even.

What if the price is below the variable cost?

There is no break-even point: every unit adds to the loss.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.