Worked example
Example: 48 V, 50 A, 15 m, 16 mm², 2 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| System voltage | 48.000 V |
| Current | 50.000 A |
| One-way cable length | 15.000 m |
| Conductor cross-section | 16.000 mm² |
| Resistivity of the conductor in service | 0.022500 Ω·mm²/m |
| Allowed voltage drop | 2.0000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Voltage drop 2 ρ L I / A | 2.1094 V |
| Voltage drop as a share of the system voltage | 4.3945 % |
| Power lost in the cable | 105.47 W |
| Smallest cross-section for the allowed drop | 35.156 mm² |
Open this example in the calculator and change any input.
Formula
\(\Delta V = \frac{2 \rho L I}{A}, \quad A_{min} = \frac{2 \rho L I}{u_{max} V}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V\) | System voltage | V |
| \(I\) | Current | A |
| \(L\) | One-way cable length | m |
| \(A\) | Conductor cross-section | m² |
| \(\rho\) | Resistivity of the conductor in service | Ω·m |
| \(u_{max}\) | Allowed voltage drop | - |
| \(\Delta V\) | Voltage drop 2 ρ L I / A | V |
| \(u\) | Voltage drop as a share of the system voltage | - |
| \(P_{loss}\) | Power lost in the cable | W |
| \(A_{min}\) | Smallest cross-section for the allowed drop | m² |
Method and standards
Resistance of the go and return conductors.
Where it is used
- Solar string and battery cables.
- DC control supplies.
Common mistakes
- Using one-way resistance.
- Sizing on drop and not checking current rating.
Assumptions and limits
- Resistive drop only.
- A drop above the allowed u_max is flagged.
References
- ΔV = 2 ρ L I / A (go and return)
- IEC 60364-5-52 Annex G (conductor resistivity in service)
Questions and answers
What drop does 50 A cause over 15 m of 16 mm² at 48 V?
2.11 V, 4.4 %.
What size keeps it to 2 %?
35 mm² at least.
Why are low-voltage DC cables so thick?
The same power at lower voltage needs more current, and the allowed drop in volts is smaller.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.