Brickwork Quantity: Bricks, Cement and Sand

Number of bricks and the cement and sand for mortar in a volume of brick masonry from brick size, joint thickness, mortar mix and allowances.

Inputs

Examples: 10 m³, 190 x 90 x 90 mm bricks, 10 mm joints, 1:61 m³, 229 x 114 x 76 mm bricks, 10 mm, 1:450 m³, 190 x 90 x 90 mm, 12 mm joints, 1:5

Brick

Mortar

Allowance for voids and bulking of sand; 1.27 to 1.33 is usual.

Results

Solid bricks without frogs; frogs filled with mortar and wastage of mortar add to the cement and sand.

Bricks per m³ of masonry (with joints)500.00
Bricks to order, with the allowance5,250.0
Wet mortar2.3050m³
Dry mortar materials3.0657m³
Cement630.65kg
Cement bags12.613
Sand2.6277m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 10 m³, 190 x 90 x 90 mm bricks, 10 mm joints, 1:6. The inputs, in the units selected above:

InputValue
Volume of brickwork10.000 m³
Brick length190.00 mm
Brick width90.000 mm
Brick height90.000 mm
Mortar joint thickness10.000 mm
Sand parts per part of cement in the mortar6.0000 -
Dry volume factor of mortar1.3300 -
Allowance for broken bricks5.0000 %
Bulk density of cement1,440.0 kg/m³
Mass of one cement bag50.000 kg

Applying the formula below gives:

ResultValue
Bricks per m³ of masonry (with joints)500.00
Bricks to order, with the allowance5,250.0
Wet mortar2.3050 m³
Dry mortar materials3.0657 m³
Cement630.65 kg
Cement bags12.613
Sand2.6277 m³

Open this example in the calculator and change any input.

Formula

\(n = \frac{1}{(l + j)(w + j)(h + j)}, \quad N = n V (1 + k_w)\)

\(V_m = V - n V\, l w h, \quad V_{m,d} = f_d V_m\)

\(m_c = \frac{V_{m,d}}{1 + s} \rho_c, \quad V_s = V_{m,d} \frac{s}{1 + s}\)

Variables

Symbol Meaning SI unit
\(V\) Volume of brickwork m³
\(l\) Brick length m
\(w\) Brick width m
\(h\) Brick height m
\(j\) Mortar joint thickness m
\(s\) Sand parts per part of cement in the mortar -
\(f_d\) Dry volume factor of mortar -
\(k_w\) Allowance for broken bricks -
\(\rho_c\) Bulk density of cement kg/m³
\(m_b\) Mass of one cement bag kg
\(n\) Bricks per m³ of masonry (with joints) -
\(N\) Bricks to order, with the allowance -
\(V_m\) Wet mortar m³
\(V_{m,d}\) Dry mortar materials m³
\(m_c\) Cement kg
\(N_b\) Cement bags -
\(V_s\) Sand m³

Method and standards

Each brick with its share of joint occupies (l + j)(w + j)(h + j); the mortar is the wall volume not taken by bricks, converted to dry materials with a dry volume factor and shared in the mix ratio.

Where it is used

  • Estimating walls, boundary walls and boiler house enclosures.
  • Ordering bricks, cement and sand.
  • Checking bills of quantities.

Common mistakes

  • Using nominal brick size that already includes the joint.
  • Forgetting frogs filled with mortar.
  • Ignoring openings in the wall volume.

Assumptions and limits

  • Solid bricks; uniform joints.
  • The count puts a joint on all three faces of every brick (a modular cell), which suits walls one brick thick or more. In a half-brick wall the thickness has no joint, so it takes fewer bricks per m³ and less mortar; compute such walls from the face area instead.
  • Mortar wastage not included.

References

  • Masonry quantity estimation from brick and joint dimensions

Questions and answers

How many 190 × 90 × 90 mm bricks in 1 m³?

With 10 mm joints each brick takes 0.2 × 0.1 × 0.1 m, so 500 bricks; 10 m³ with 5 % breakage needs 5 250.

How much mortar?

The space left: 0.23 m³ wet per m³ here, 0.31 m³ dry with a 1.33 factor, giving 63 kg of cement per m³ in 1:6.

Why a dry factor for mortar?

Sand bulks and voids fill when mixed with water, so dry materials exceed the wet volume.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.