Field Density by Sand Replacement and Degree of Compaction

Test-hole volume, bulk and dry density of compacted soil from the sand-replacement test, and relative compaction against the lab maximum.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationRefinery and petrochemicalChemical and fertiliserPulp and paper

Inputs

Examples: Fill layer testGranular sub-base

Results

The sand mass is that in the hole only (exclude the cone of the pouring cylinder, found by calibration). Specifications often require 95 % of standard or 90 % of modified Proctor maximum dry density.

Hole volume2.7097L
Bulk density2,251.2kg/m³
Dry density2,123.8kg/m³
Relative compaction98.780%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Fill layer test. The inputs, in the units selected above:

InputValue
Mass of sand filling the hole3.6000 kg
Calibrated sand bulk density1,500.0 kg/m³
Mass of wet soil excavated4.6000 kg
Moisture content (dry basis)12.000 %
Laboratory maximum dry density1,900.0 kg/m³

Applying the formula below gives:

ResultValue
Hole volume2.4000 L
Bulk density1,916.7 kg/m³
Dry density1,711.3 kg/m³
Relative compaction90.069 %

Open this example in the calculator and change any input.

Formula

\(V = \frac{m_s}{\rho_s}, \quad \rho_d = \frac{m_w/V}{1 + w}, \quad RC = \frac{\rho_d}{\rho_{d,max}}\)

Variables

Symbol Meaning SI unit
\(m_s\) Mass of sand filling the hole kg
\(\rho_s\) Calibrated sand bulk density kg/m³
\(m_w\) Mass of wet soil excavated kg
\(w\) Moisture content (dry basis) -
\(\rho_{d,max}\) Laboratory maximum dry density kg/m³
\(V\) Hole volume m³
\(\rho\) Bulk density kg/m³
\(\rho_d\) Dry density kg/m³
\(RC\) Relative compaction -

Method and standards

Density definitions.

Where it is used

  • Earthwork compaction control.
  • Plant site grading and roads.

Common mistakes

  • Including the cone sand in the hole volume.
  • Moisture sample drying incomplete.

Assumptions and limits

  • Representative sample.

References

  • Sand replacement method (IS 2720-28 / ASTM D1556 principle)

Questions and answers

Why use sand?

Dry uniform sand pours to a known density, so its mass gives the hole volume.

What compaction is required?

Commonly 95 % of standard Proctor for structural fill and 90–95 % of modified Proctor for pavements.

What do the defaults represent?

A field test on a compacted fill layer.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.