Compaction: Dry Density, Zero-Air-Voids Line and Relative Compaction

Dry density from a field or Proctor test, the zero-air-voids dry density at the same water content, and relative compaction against the maximum dry density.

Inputs

Examples: Proctor mouldSand replacement in the field

Results

Bulk density2,033.9kg/m³
Dry density1,784.1kg/m³
Zero-air-voids dry density at this water content1,959.4kg/m³
Relative compaction ρ_d/ρ_{d,max}93.901%
Air voids8.9437%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Proctor mould. The inputs, in the units selected above:

InputValue
Mass of wet soil in the mould or hole1.9200 kg
Volume of the mould or hole944.00 mL
Water content14.000 %
Specific gravity of the solids2.7000 -
Maximum dry density from the Proctor test1,900.0 kg/m³

Applying the formula below gives:

ResultValue
Bulk density2,033.9 kg/m³
Dry density1,784.1 kg/m³
Zero-air-voids dry density at this water content1,959.4 kg/m³
Relative compaction ρ_d/ρ_{d,max}93.901 %
Air voids8.9437 %

Open this example in the calculator and change any input.

Formula

\(\rho_d = \frac{m/V}{1 + w}, \quad \rho_{d,zav} = \frac{G_s \rho_w}{1 + w G_s}, \quad RC = \frac{\rho_d}{\rho_{d,max}}\)

Variables

Symbol Meaning SI unit
\(m\) Mass of wet soil in the mould or hole kg
\(V\) Volume of the mould or hole m³
\(w\) Water content -
\(G_s\) Specific gravity of the solids -
\(\rho_{d,max}\) Maximum dry density from the Proctor test kg/m³
\(\rho\) Bulk density kg/m³
\(\rho_d\) Dry density kg/m³
\(\rho_{d,zav}\) Zero-air-voids dry density at this water content kg/m³
\(RC\) Relative compaction ρ_d/ρ_{d,max} -
\(a_c\) Air voids -

Method and standards

Phase relations.

Where it is used

  • Fill and embankment quality control.
  • Proctor test sheets.

Common mistakes

  • Bulk density compared with the maximum dry density.
  • Wrong mould volume.

Assumptions and limits

  • Water density 1000 kg/m³.
  • A dry density above the zero-air-voids value (negative air voids) is flagged as a test or input error.

References

  • Dry density and zero-air-voids relation (ASTM D698 / IS 2720 Part 7 calculations)

Questions and answers

1.92 kg in a 944 cm³ mould at 14 % water?

Bulk 2034, dry 1784 kg/m³; zero-air-voids 1959 kg/m³.

What relative compaction is required?

Your specification's figure, often 95 % of the Proctor maximum.

Why the zero-air-voids line?

No compacted point can lie above it.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.