FireCADCalc

Time for Consolidation (Terzaghi Time Factor)

Time for a clay layer to reach a degree of consolidation from the coefficient of consolidation and drainage path, by Terzaghi's time factor, or the degree reached.

Inputs

Examples: 4 m doubly drained, 90 %Single drainage 50 %Thin layer, short time

From the oedometer test; often quoted in m²/year.

Results

Uses the standard approximations T_v = (π/4)U² for U ≤ 60 % and T_v = 1.781 − 0.933 log(100 − U%) above.

Drainage path3.0000m
Time factor for U0.19635
Time to reach U645.45d
Degree reached after the elapsed time53.192%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 4 m doubly drained, 90 %. The inputs, in the units selected above:

InputValue
Coefficient of consolidation2.0000 m²/a
Layer thickness4.0000 m
DrainageDouble (top and bottom): H_d = H/2
Degree of consolidation wanted90.000 %
Elapsed time (for the degree reached)365.25 d

Applying the formula below gives:

ResultValue
Drainage path2.0000 m
Time factor for U0.84800
Time to reach U619.46 d
Degree reached after the elapsed time76.396 %

Open this example in the calculator and change any input.

Formula

\(t = \frac{T_v H_d^2}{c_v}, \quad T_v = \frac{\pi}{4}U^2\ (U \le 0.6), \quad T_v = 1.781 - 0.933\log_{10}(100 - U\%)\)

Variables

Symbol Meaning SI unit
\(c_v\) Coefficient of consolidation m²/s
\(H\) Layer thickness m
\(\text{drainage}\) Drainage -
\(U\) Degree of consolidation wanted -
\(t\) Elapsed time (for the degree reached) s
\(H_d\) Drainage path m
\(T_v\) Time factor for U -
\(t_U\) Time to reach U s
\(U(t)\) Degree reached after the elapsed time -

Method and standards

Terzaghi theory with standard fits.

Where it is used

  • Preloading schedules.
  • Settlement with time for tanks and embankments.

Common mistakes

  • Full thickness for double drainage.
  • cv units.

Assumptions and limits

  • Uniform initial excess pressure.
  • c_v is entered in m²/s; divide a value in m²/year by 3.156 × 10⁷.

References

  • Terzaghi one-dimensional consolidation; time-factor approximations (Das, Principles of Geotechnical Engineering)

Questions and answers

4 m doubly drained, cv 2 m²/year, 90 %?

T_v 0.848: about 619 days.

Why does drainage matter so much?

Time grows with the square of the drainage path.

Sand drains?

They shorten the path; radial consolidation needs its own theory.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.